Mineralised Zone Extended to 12 km at Opuwo Cobalt Project
Released
Released
Announcement PDF
RELEASE
8 June 2017
ASXASX
RELEASE
| 16| February
2017
MINERALISED ZONE EXTENDED TO 12 KM
AT OPUWO COBALT PROJECT
HIGHLIGHTS
•
Cobalt-copper mineralisation now confirmed by assays over approximately 12 km of strike.
•
Latest results include:
•
6 m @ 0.17% cobalt and 0.52% copper, including 4 m @ 0.23% cobalt and 0.62% copper.
•
10 m @ 0.14% cobalt and 0.43% copper.
•
6 m @ 0.13% cobalt and 0.64% copper.
•
4 m @ 0.14% cobalt and 0.56% copper.
•
3 m @ 0.11% cobalt and 0.39% copper.
•
Mineralisation continues to return low levels of deleterious elements such as arsenic, cadmium
and uranium.
•
Drilling nearing completion at the Western Zone, where higher grade cobalt mineralisation (up
to 4,300 ppm, or 0.43%) has been identified at surface. Assays are pending.
•
Diamond drilling has commenced, to collect samples for metallurgical testing.
•
Metallurgical testing program, preliminary mining studies and resource definition drilling
planned to provide input into Project Scoping Study, with completion before the end of 2017.
Celsius Resources Limited (“Celsius” or “the Company”) is pleased to announce continuing strong assay results
from drilling at the Opuwo Cobalt Project (“Project”) in Namibia. New sample assays have extended cobaltcopper mineralisation across a distance of approximately 12 km (Figure 1).
Celsius Managing Director, Brendan Borg commented:
“The assay results from Opuwo continue to expand the cobalt-copper mineralised zone. Importantly,
zones of higher grade mineralisation, at over 0.2% cobalt, are being discovered at the Project by Celsius.
In our view the continued strength in the cobalt price, currently at over USD56,000 per tonne, increases
the appeal of a cobalt dominant Project, such as Opuwo.”
Discussion of Results
Significant intercepts from the latest batch of drilling assays, using a cutoff grade of 0.05% (500 ppm) cobalt
(Appendix 1), include:
•
•
•
•
•
6 m @ 0.17% cobalt and 0.52% copper, from 71 m, including 4 m @ 0.23% cobalt and 0.62% copper,
from 73 m (DOFR21)
10 m @ 0.14% cobalt and 0.43% copper, from 62 m (DOFR22)
6 m @ 0.13% cobalt and 0.64% copper, from 147 m (DOFR26)
4 m @ 0.14% cobalt and 0.56% copper, from 26 m (DOFR24)
3 m @ 0.11% cobalt and 0.39% copper, from 23 m (DOFR23)
These results are consistent with previous batches of results received (refer ASX releases from 20 April, 27 April
and 8 May, 2017), and importantly continue to show potential for higher grade zones within the extensive
mineralised system at Opuwo.
•
•
•
•
•
•
•
•
•
•
•
•
19 m @ 0.13% cobalt and 0.62% copper, from 87 m (DOFR04)
7 m @ 0.17% cobalt and 0.49% copper, from 66 m (DOFR06)
7 m @ 0.16% cobalt and 0.64% copper, from 88 m (DOFR08)
7 m @ 0.13% cobalt and 0.53% copper, from 54 m (DOFR10)
6 m @ 0.13% cobalt and 0.37% copper, from 56 m (DOFR14)
6 m @ 0.12% cobalt and 0.55% copper, from 46 m (DOFR03)
5 m @ 0.20% cobalt and 0.52% copper, from 80 m (DOFR12)
5 m @ 0.15% cobalt and 0.44% copper, from 57 m (DOFR11)
5 m @ 0.14% cobalt and 0.53% copper, from 76 m (DOFR09)
5 m @ 0.12% cobalt and 0.66% copper, from 87 m (DOFR19)
4 m @ 0.15% cobalt and 0.80% copper, from 41 m (DOFR07)
4 m @ 0.13% cobalt and 0.57% copper, from 44 m (DOFR05)
The mineralisation extends to surface and outcrops in many places and, based on the assay data to date, grades
appear to increase with depth. This is considered to be due to near surface weathering of the sulphides hosting
the mineralisation. Further drilling is being conducted to test for down dip extensions and confirm the true
ASX RELEASE | PAGE
2
thickness of the mineralisation. The intersection in DOFR26 (6m at 0.13% cobalt and 0.64% copper from 147
m) reported in this release, is an important hole in terms of demonstrating this down dip continuity of the
mineralisation. This hole intersected mineralisation at a vertical depth 120 metres below surface and down-dip
from DOFR03 and DOFR04.
Results from holes DOFR21 to DOFR24, reported in this release, are located outside the currently defined
Exploration Target, consisting of between 33 and 41 million tonnes, grading approximately 0.13% - 0.17%
cobalt and 0.45% - 0.65% copper, and demonstrate the potential to expand this target as further results come
to hand. (Please refer to ASX release of 18 May, 2017 for details on the Exploration Target). It is noted that the
potential quantity and grade is conceptual in nature, and that there has been insufficient exploration to estimate
a Mineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
Assay results continue to indicate that the mineralisation at Opuwo is low in deleterious elements such as
arsenic, cadmium and uranium. Field observations and previous mineralogical studies indicate simple sulphide
mineralogy for the elements of interest, including cobalt present as cattierite (CoS2).
Current Drill Program
This initial phase of drilling is designed to test a 20 km (of a total 30 km) strike length of the cobalt-copper
mineralised DOF horizon. Wide spaced drilling has been completed across approximately 12 km of strike, with
the mineralised horizon confirmed by assays in each drill fence to date (Figures 1 and 2).
Drilling is now proceeding to step out to the west of the currently drilled area, where higher grade cobalt
mineralisation (up to 0.43%, or 4,300 ppm) has been identified in surface sampling and trenching.
Diamond drilling has now commenced, providing samples for first pass metallurgical testing. The planned
metallurgical studies, along with preliminary mining studies and resource definition drilling, will contribute to a
Scoping Study for the Project, planned to be completed before the end of 2017.
ASX RELEASE | PAGE
3
Figure 1: Drilling Assay Results extending mineralised strike to 12 km
ASX RELEASE | PAGE
4
Figure 2: Strike length of mapped and interpreted dolomite ore formation (DOF) at the Project
Background on the Opuwo Cobalt Project
The Opuwo Cobalt Project is located in northwestern Namibia, approximately 800 km by road from the capital,
Windhoek, and approximately 750 km from the port at Walvis Bay (Figure 4). The Project has excellent
infrastructure, with the regional capital of Opuwo approximately 30 km to the south, where services such as
accommodation, fuel, supplies, and an airport and hospital are available. Good quality bitumen roads connect
Opuwo to Windhoek and Walvis Bay. The Ruacana hydro power station (320 MW), which supplies the majority
of Namibia’s power, is located nearby, and a 66 kV transmission line passes through the eastern boundary of
the Project.
The identification of the geological similarities of the DOF horizon with the “Ore Shale” of the Central African
Copperbelt and the discovery of Namibia’s first significant cobalt mineralisation at the Opuwo Cobalt Project
goes back to exploration activities led by Dr. Rainer Ellmies. Despite intensive surface exploration by previous
explorers, only seven drill holes had tested the DOF horizon prior to the current phase of exploration. Only the
recently drilled holes, DOF01 and DOF02, were assayed for cobalt, with significant results comprising:
•
•
8 m @ 1137 ppm cobalt, 0.54% copper and 0.53% zinc, from 60.4 m (DOF02)
4.65 m @ 1153 ppm cobalt, 0.55% copper, 0.59% zinc, from 106.65 m (DOF01)
ASX RELEASE | PAGE
5
Celsius is gaining exposure to the Project via the following stages of expenditure on exploration:
•
•
•
An initial 30% interest will be earned by expenditure of $500,000 within 6 months of exercising the option
to proceed,
a further 30% to be earned following expenditure of a further $1,000,000 within 12 months of completing
the stage 1 earn in, and
a final 16% to be earned following expenditure of a further $1,000,000 within 6 months of completing
the stage 2 earn in.
Following the earning of the 76% interest all parties will be required to contribute to exploration.
Figure 3: Location of the Opuwo Cobalt Project, Namibia
Background on Cobalt
Cobalt has a diverse range of metallurgical and chemical uses ranging from aircraft engines to rechargeable
batteries. Strong demand for rechargeable batteries has been the biggest growth driver for cobalt consumption
and demand is forecast to continue to increase as batteries are increasingly adopted in households and vehicles.
Cobalt cathode chemistry continues to be the product of choice for applications requiring thin, flexible and high
energy density batteries with the best possible cycle life. Furthermore, automotive related demand for cobalt
containing battery materials is expected to rapidly increase in coming years with increasing sales of plug in
hybrid and fully electric vehicles.
ASX RELEASE | PAGE
6
In its 2016 market outlook respected industry group CRU stated: “The refined cobalt market will fall into a
3,000 tonne deficit this year following seven years of overcapacity and oversupply. CRU anticipates prices to
increase onward into 2017 as global demand for refined cobalt exceeds the 100,000 tonne mark and mine and
refined supply tightens.”
Cobalt resources and production are concentrated in the Democratic Republic of Congo, which has close to half
of the world’s cobalt reserves and accounts for more than half of the world’s production. The balance of the
world’s cobalt is concentrated in Australia, Cuba, Zambia, New Caledonia, Canada, Russia and Brazil. Notably,
the United States has no domestic resources of cobalt ore. As a result of the industrial importance of cobalt and
the concentration of supply, cobalt is classed as a strategic mineral by the USGS and as a critical raw material
by the EU.
-
ENDS
-
Celsius Resources Contact Information
Level 3, 216 St Georges Terrace
Perth WA 6000
PO Box 7775
Cloisters Square Perth WA 6850
P: +61 8 9226 4500
F: +61 8 9226 4300
E: info@celsiusresources.com.au
www.celsiusresources.com.au
Competent Persons Statement
Information in this report relating to Exploration Results is based on information reviewed by Mr. Brendan Borg, who is a Member of
the Australasian Institute of Mining and Metallurgy and Managing Director of Celsius Resources. Mr. Borg has sufficient experience
which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for reporting of Exploration Results, Mineral
Resources and Ore Reserves. Mr. Borg consents to the inclusion of the data in the form and context in which it appears. The
Exploration Results are based on standard industry practices for drilling, logging, sampling, assay methods including quality
assurance and quality control measures as detailed in Appendix 2.
ASX RELEASE | PAGE
7
Appendix 1. CLA Drilling at the Opuwo Cobalt Project
Hole ID
DOFR03
DOFR04
including
DOFR05
DOFR06
including
DOFR07
DOFR08
DOFR09
DOFR10
DOFR11
DOFR12
DOFR13
DOFR14
DOFR15
DOFR16
and
DOFR17
DOFR18
DOFR19
DOFR20
DOFR21
including
including
DOFR22
DOFR23
DOFR24
DOFR25
DOFR26
DOFR27
DOFR28
DOFR29
DOFR30
DOFR31
DOFR32
Easting
Northing
(UTM
(UTM
Zone 33S) Zone 33S) Dip
Final
Azimuth Depth Intercept Intercept Interval
(m)
(mag)
From (m) To (m)
(m)
365148
365148
8026718
8026720
-55
-90
180
180
58
112
366981
366981
8026370
8026373
-55
-90
180
180
55
86
367745
367742
366049
366060
370176
370176
372034
372034
374531
374421
8026254
8026266
8026549
8026497
8026304
8026305
8026137
8026138
8025781
8025771
-55
-90
-55
-90
-55
-90
-55
-85
-55
-55
180
180
180
180
180
180
180
180
200
200
50
99
87
66
70
90
50
70
130
70
374422
368497
368526
368497
364229
8025788
8026351
8026224
8026469
8026530
-90
-55
-55
-55
-55
200
180
180
180
180
70
117
99
80
87
364232
363667
363667
360902
365187
365187
362029
362709
358774
363577
366064
8026504
8025977
8025980
8026568
8026845
8026844
8026240
8026133
8026077
8025781
8026658
-90
-55
-90
-55
-55
-75
-55
-55
-55
-55
-55
180
135
135
200
180
180
200
200
200
200
180
81
41
40
200
170
184
93
189
181
96
162
Cobalt
(ppm)
Copper
(%)
Zinc
(%)
Manganese
(%)
52
6
0.12
0.55
0.39
106
19
0.13
0.62
0.71
94
7
0.13
1.11
1.10
48
4
0.13
0.57
0.45
73
7
0.17
0.49
0.61
71
2
0.31
0.41
1.13
45
4
0.15
0.80
0.62
95
7
0.16
0.64
0.61
81
5
0.14
0.53
0.45
61
7
0.13
0.53
0.62
62
5
0.15
0.44
0.48
85
5
0.20
0.52
0.61
40
3
0.09
0.24
0.63
62
6
0.13
0.37
0.28
No Significant Intercept (missed DOF horizon)
11
17
6
0.08
0.22
0.18
19
21
2
0.09
0.28
0.13
No Significant Intercept (below 500ppm reporting cutoff grade)
No Significant Intercept (missed DOF horizon)
87
92
5
0.12
0.66
0.42
29
32
3
0.11
0.33
0.39
71
77
6
0.17
0.52
0.75
73
77
4
0.23
0.62
0.71
75
76
1
0.39
0.65
1.33
62
72
10
0.14
0.43
0.47
23
26
3
0.11
0.39
0.44
26
30
4
0.14
0.56
0.54
No Significant Intercept (missed DOF horizon)
147
153
6
0.13
0.64
0.61
Results Pending
Results Pending
Results Pending
Results Pending
Results Pending
Results Pending
46
87
87
44
66
69
41
88
76
54
57
80
37
56
1.43
1.75
1.53
1.69
1.92
3.17
1.91
1.69
1.59
1.57
1.58
1.83
1.17
1.8
0.83
1.39
1.53
2.08
1.76
1.91
2.32
1.53
2.09
2.31
1.82
Notes: Significant intersections reported using a cutoff grade of 0.05% cobalt (500 ppm)
ASX RELEASE | PAGE
8
Appendix 2. The following tables are provided to ensure compliance with the JORC Code (2012)
requirements for the reporting of Exploration Results for the Opuwo Cobalt Project
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Sampling
•
techniques
•
•
Drilling
•
techniques
Drill sample
•
recovery
•
•
Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where
‘industry standard’ work has been
done this would be relatively simple
(eg ‘reverse circulation drilling was
used to obtain 1 m samples from
which 3 kg was pulverised to produce
a 30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation types
(eg submarine nodules) may warrant
disclosure of detailed information.
Drill type (eg core, reverse
circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple
or standard tube, depth of diamond
tails, face-sampling bit or other type,
whether core is oriented and if so, by
what method, etc).
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
Commentary
•
•
•
Reverse Circulation (RC) drilling using standard equipment.
Sampling was undertaken at one metre intervals.
Drilling designed to intersect the DOF horizon based on mapped or
interpreted location.
•
Reverse circulation percussion.
•
Recovery generally recorded as good, with poor recovery in a small
number of samples due to groundwater.
ASX RELEASE | PAGE
9
Criteria
JORC Code explanation
Logging
•
•
•
Sub-sampling
•
techniques
and sample
•
preparation
•
•
•
•
Quality of
•
assay data
and laboratory
tests
•
•
Verification of
•
sampling and
assaying
•
•
Commentary
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
•
•
•
Drilling logged in detail on a metre by metre basis.
Lithology, alteration and oxidation logged qualitatively.
Sulphide and quartz vein content logged quantitatively.
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times,
calibrations factors applied and their
derivation, etc.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (ie lack of bias)
and precision have been established.
The verification of significant
intersections by either independent
or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification,
•
•
RC drill samples split using a rig mounted cone splitter.
Field duplicates collected to confirm representivity of sampling.
•
Samples were assayed prepared at Activation Laboratories Limited
(ACTLABS) Windhoek laboratory, and assayed at ACTLABS in Ancaster,
Canada. A total acid digestion sample preparation method and ICP finish
were utilised.
No geophysical tools were used to determine any element concentration in
these results.
The drilling program included field duplicates, standards and blanks that
were inserted into the drill sequence, in addition to the standard QA/QC
samples and procedures used by the laboratory. No abnormalities were
detected.
•
•
•
•
Mineralised zones reported in assays correspond approximately with the
zones as logged in the field, and the tenor of grades is consistent with
previous drilling and surface sampling.
No twin holes have yet been drilled, however, several of the RC holes will
be twinned by diamond holes in the coming months.
ASX RELEASE | PAGE 10
Criteria
JORC Code explanation
•
Location of
•
data points
•
•
Data spacing
•
and
•
distribution
•
Orientation of
•
data in
relation to
geological
structure
Sample
•
•
security
Audits or
•
reviews
Commentary
data storage (physical and
electronic) protocols.
Discuss any adjustment to assay
data.
•
Accuracy and quality of surveys used
to locate drill holes (collar and downhole surveys), trenches, mine
workings and other locations used in
Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
•
•
•
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
Whether sample compositing has
been applied.
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered
to have introduced a sampling bias,
this should be assessed and reported
if material.
The measures taken to ensure
sample security.
•
•
Drill samples delivered to laboratory by senior Celsius or Gecko Namibia
staff.
The results of any audits or reviews
of sampling techniques and data.
•
No review has been carried out.
•
•
•
•
•
An electronic database containing collars, geological logging and assays is
maintained by the Company.
No adjustment to assay data has been made.
All sampling located by hand held GPS.
UTM grid WGS84 Zone 33 (South).
Holes will be surveyed using Differential GPS (DGPS) prior to potential
resource modelling.
Down hole surveys to measure hole deviation are being completed where
possible.
Drill spacing approximately every 500 – 1,000 metres along the strike of
the DOF horizon (based on mapping / interpretation).
Optimum drill spacing to delineate a Mineral Resource not yet known. To
be determined from assay data / assessment of grade variability.
Drilling of angled holes aimed to test perpendicular to DOF horizon. Some
holes were designed to be oblique to mineralisation.
Further drilling will better determine the orientation of the geological
features and mineralisation and enable any biases to be determined.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Mineral
•
tenement and
land tenure
status
•
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any
known impediments to obtaining a
Commentary
•
•
The Opuwo Cobalt Project comprises a single Exclusive Prospective
License EPL4346 owned by Kunene Resources (Pty) Ltd.
The licence is undergoing the renewal process for a further two year term
from June 2017.
ASX RELEASE | PAGE 11
Criteria
JORC Code explanation
Commentary
licence to operate in the area.
Exploration
•
Acknowledgment and appraisal of
exploration by other parties.
•
Previous work carried out by Kunene Resources includes geological
mapping, outcrop sampling, soil sampling, high resolution magnetic and
radiometric data and hyperspectral data. Two holes were drilled in 2015,
which intersected cobalt, copper and zinc mineralisation.
•
Deposit type, geological setting and
style of mineralisation.
•
Copper-cobalt mineralisation is developed in a sedimentary package of
likely Nosib succession. Arkose quartzitic sandstones and conglomerates of
the footwall Nosib Formation are exposed to the west and southwest
The upper Nosib or Ombombo Formation consists of a sequence of finely
intercalated siltstones and shales with minor sandstone, marlstone,
limestone and dolostone layers.
done by other
parties
Geology
•
Drill hole
•
Information
•
Data
•
aggregation
methods
•
•
Relationship
•
between
mineralisation
•
A summary of all information material
to the understanding of the
exploration results including a
tabulation of the following information
for all Material drill holes:
o easting and northing of the drill
hole collar
o elevation or RL (Reduced Level –
elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and
interception depth
o hole length.
If the exclusion of this information is
justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
Where aggregate intercepts
incorporate short lengths of high
grade results and longer lengths of
low grade results, the procedure used
for such aggregation should be stated
and some typical examples of such
aggregations should be shown in
detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
These relationships are particularly
important in the reporting of
Exploration Results.
If the geometry of the mineralisation
•
All information detailed in Appendix 1.
•
Simple length weighted averages were used for reporting of significant
intercepts. Significant intercepts were reported using a cutoff grade of
0.05% (or 500 ppm) cobalt.
•
Orientation of drilling vs dip of DOF horizon likely means that the downhole
length reported for the DOF is not true width.
Determination of the orientations and thickness of mineralisation will be
•
ASX RELEASE | PAGE 12
Criteria
JORC Code explanation
widths and
intercept
lengths
•
Diagrams
•
Balanced
•
reporting
Other
•
substantive
exploration
data
Further work
•
•
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (eg ‘down hole length, true
width not known’).
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These
should include, but not be limited to a
plan view of drill hole collar locations
and appropriate sectional views.
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low
and high grades and/or widths should
be practiced to avoid misleading
reporting of Exploration Results.
Other exploration data, if meaningful
and material, should be reported
including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical
test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious
or contaminating substances.
The nature and scale of planned
further work (eg tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Commentary
possible with further drilling, and in particular, diamond drilling, which has
recently commenced.
•
Refer Figures 1 and 2. Sectional views will be compiled once an accurate
assessment can be made of the geometry of the mineralisation.
•
All holes have been reported.
•
Geophysical and geological datasets detailed in previous releases.
•
Planned further work detailed in this, and previous releases, and in figures.
This work comprises drill testing along a significant portion of the
mapped/interpreted mineralised unit, to determine the most prospective
areas for follow up work and potential resource definition.