CELSIUS RESOURCES LIMITED
ANNUAL REPORT
30 June 2023
CONTENTS
Corporate Directory
3
Chairman’s Letter
4
Directors’ Report
5
Corporate Governance Statement
23
Consolidated Statement of Profit or Loss and Other Comprehensive Income
30
Consolidated Statement of Financial Position
31
Consolidated Statement of Changes in Equity
32
Consolidated Statement of Cash Flows
33
Notes to the Financial Statements
34
Directors’ Declaration
52
Auditor’s Independence Declaration
53
Independent Auditor’s Report
54
Additional information
58
2
CORPORATE DIRECTORY
DIRECTORS
Mr Julito Sarmiento
Executive Chairman
Mr Peter Hume
Managing Director
Mr Michael Hulmes
Non-Executive Director
Mr Simon Farrell
Non-Executive Director
Mr Paul Dudley
Non-Executive Director
Ms Attilenore Manero
Non-Executive Sustainability Director
COMPANY SECRETARY
Mrs Kellie Davis
REGISTERED OFFICE & CONTACTS
Level 5, 191 St Georges Terrace
Perth WA 6000
Ph: +61 2 8072 1400
E: info@celsiusresources.com.au
Web: www.celsiusresources.com.au
Stock Exchange Listing – ASX/AIM Code: CLA
SOLICITORS
Hamilton Locke
Level 48
152-158 St Georges Terrace
PERTH WA 6000
Ph: +61 8 6311 9160
AUDITORS
RSM Australia Partners
Level 32 Exchange Tower
2 The Esplanade
PERTH WA 6000
Ph: +61 8 9261 9100
Fax: +61 8 9261 9111
SHARE REGISTRY
Automic Registry Services
Level 5
191 St Georges Terrace
PERTH WA 6000
Ph: +61 8 9324 2099
3
CHAIRMAN’S LETTER
Dear Fellow Shareholders,
It has been a challenging year for us as Celsius Resources Limited underwent major changes at the Board level to ensure the
Company’s sustainability. The passing of our colleague and former Chairman, Martin Buckingham, was a game changer. Peter and I
have taken on the reins of the Company to continue what Martin has started and to transform our shared vision into reality.
The addition of Paul Dudley and Attilenore Manero, whose deep experience, expertise, and diverse perspectives have complemented
the existing Board skill sets as we strive to come up with the most appropriate strategies and deliver results for the Company and our
shareholders.
We have listed on AIM, a market operated by the London Stock Exchange in January 2023, to encourage more institutional investors
to support current and future developments for the Company’s portfolio of assets into operating mines. In parallel, we have launched
direct marketing and communications campaigns to prospective institutions for this purpose. As a result, we have received strong
interest from several institutions to develop the MCB, Sagay, and Opuwo projects. We were also able to raise A$14,193,361 as
working capital to finance the development of our flagship Maalinao-Caigutan-Biyog Project in the Philippines as well as the Opuwo
Project in Namibia.
For this period, we have achieved several milestones in advancing our copper-gold assets in the Philippines through the concerted
efforts and perseverance of our in-country teams.
Foremost is the signing of the agreement with the Balatoc Indigenous Cultural Community through a free, prior and informed consent
process as a demonstration of our commitment to abide by and respect the customary laws and traditions of the community in all
aspects of our engagements.
Another milestone is the issuance of the Environmental Compliance Certificate (ECC) signifying that we have complied with all the
national government requirements in accordance with an approved environmental plan and that the MCB Project will not cause
significant negative environmental impact. We are the first mining company in the Philippines with a voluntary supplemental
agreement for sustainable mining development and management over and above the standard ECC requirements which is focused
on four key result areas: 1) Water and Environment; 2) Noise Pollution and Waste Management; 3) Power Management and Carbon
Sequestration Program; and 4) Social Development and Community Resilience.
Most recently, our MCB Project received the approval for its Declaration of Mining Project Feasibility (DMPF) from the national
government proclaiming the feasibility of commercial utilisation of the minerals in the tenement area by internationally accepted
sound mining practices, socially acceptable, environmentally safe, and economically sound methods as specified in the Mining Project
Feasibility Study and supported by other requirements as prescribed in the Philippine mining laws, rules and regulations.
We have been working closely with the Philippine Department of Environment and Natural Resources and the Mines and Geosciences
Bureau to fast-track the approval of the Mineral Production Sharing Agreement (MPSA), the final outstanding mining permit for the
MCB Project which we envisaged to receive within the coming months. This will pave the way for the development of MCB Project
which will bring about transformative change in the communities we work with as partners.
Our Sagay Copper-Gold and Opuwo Cobalt-Copper Projects have also progressed to capitalise on the surging investor interest in
battery metals and the clean energy transition.
I personally want to recognise the contribution of our dedicated colleagues for their commitment and hard work in pushing our
projects forward. I also want to thank our stakeholders in the national and local governments for their guidance and support as we
affirm our commitment to go ‘beyond regulatory compliance’. Our gratitude also to our host communities, particularly, the Balatoc
Indigenous Cultural Community for their trust and confidence that we can bring these projects to fruition.
Lastly, we thank you, our fellow shareholders, for your trust, patience, support, and candid feedback as we navigate the challenges
and overcome hurdles of the past year. We will continue to seek opportunities to drive the Company forward as we do our best to
come up with a strong Environmental, Social and Governance (“ESG”) performance to enhance shareholder value and investor
confidence.
We remain confident and committed to developing these projects into responsible operating mines that would create significant
value for both our shareholders and stakeholders alike.
Yours faithfully,
Atty. Julito ‘Sarge’ R. Sarmiento
Executive Chairman
4
DIRECTORS’ REPORT
Your Directors present their report, together with the financial statements on the consolidated entity, consisting of Celsius Resources
Limited and the entities it controlled at the end of, or during, the year ended 30 June 2023.
DIRECTORS
The names of Directors in office at any time during or since the end of the year are listed below. Directors have been in office since
the start of the financial year to the date of this report unless otherwise stated.
NAME OF PERSON
POSITION
Mr. Julito Sarmiento
Executive Chairman (appointed 23 March 2023), previously Non-Executive Chairman (appointed 17
November 2022) and Non-Executive Director
Executive Chairman (resigned 14 November 2022)
Managing Director (appointed 22 March 2023), previously Executive Director
Non-Executive Director
Non-Executive Director
Non-Executive Director (appointed 30 January 2023)
Non-Executive Sustainability Director (appointed 22 March 2023)
Non-Executive Vice Chairman (appointed 15 November 2022 and resigned 6 April 2023), previously
Non-Executive Director
Mr. Martin Buckingham
Mr. Peter Hume
Mr. Simon Farrell
Mr. Michael Hulmes
Mr. Paul Dudley
Ms. Attilenore Manero
Mr. Jonathan Colvile
COMPANY SECRETARIES
Mrs Kellie Davis (appointed 12 September 2022)
Ms Melanie Ross (resigned 4 November 2022)
OPERATING RESULTS
The loss of the consolidated entity amounted to $5,728,882 (2022: $3,913,625) after providing for income tax and non-controlling
interests.
DIVIDENDS
No dividends were paid or declared since the start of the financial year. No dividend has been recommended.
PRINCIPAL ACTIVITIES
During the year, the principal activities of the consolidated entity consisted of mineral exploration in Namibia and the Philippines.
REVIEW OF OPERATIONS
Corporate
During the financial year, $14,526,511 was raised to progress activities at the Company’s flagship project, Maalinao-Caigutan-Biyog
Copper-Gold (MCB) Project, along with expenditures for the Opuwo Cobalt Project to undertake drilling and metallurgical test work
and carry-out necessary revisions to the scoping study, along with undertaking resource analysis, modelling, and to continue field
operations for the Sagay Project.
On 22 December 2022, the Company had a $2.8 million investment by Lind Global Fund II, LP, a fund managed by the Lind Partners
(“Lind”), via an initial $1.3 million prepayment of cash for placements of ordinary fully paid shares in the Company. On 5 May 2023,
the Company repaid Lind $882,500, being 100% of the Advance Payment Credit outstanding to Lind in cash, being $882,500, in cash
and the agreement with Lind was terminated.
On 30 January 2023, the Company listed on AIM, a market operated by the London stock exchange, raising GBP 2.4 million (before
costs). The purpose of the listing is to encourage more institutional investors to participate in future capital raises that will support
current and future development of assets into operating mines.
On 15 May 2023, the Company announced it had signed a non-binding term sheet and a AUD 5 million binding subscription agreement
for a proposed acquisition by Canadian-based mining company, Silvercorp Metals Inc. As at the date of this report, the Company
confirms that the exclusivity period has lapsed and therefore has commenced discussions with other potential investors.
Maalinao-Caigutan-Biyog Copper-Gold Project, Philippines (Celsius-100%)
5
DIRECTORS’ REPORT
Makilala Mining Company, Inc (“MMCI”)., Celsius’ Philippine subsidiary, continues to progress towards securing government and
community approvals for the Maalinao-Caigutan-Biyog Copper-Gold Project (“MCB” or “the Project”) in the Cordillera Administrative
Region, approximately 320km north of Manila.
During the period, MMCI has fulfilled the physical and financial commitments under its approved Exploration, Environment and
Community Development Program, and Safety and Health Program for the MCB Project which was embodied in the Terminal Reports
submitted to the Philippine Mines and Geosciences Bureau (MGB).
Preparations of key technical, social, and environmental studies were also completed to support the application for Declaration of
Mining Project Feasibility (“DMPF) and subsequently the application for a Mineral Production Sharing Agreement with the Philippine
Government which will pave the way for development and operations of the MCB Project.
Exploration Work Program
Drilling activities from July to November 2022 focused on collecting data and required samples for hydrogeological and geotechnical
studies. Five drill holes were completed for the period (MCB-040, MCB-041, MCB-042, MCB-043, and MCB-044) which identified
some shallow high-grade copper mineralisation not previously defined from the earlier drilling programs. The impact of this additional
copper mineralisation was significant at shallow levels, as defined by an increase to the copper content at higher cut-off grades and
tighter definition of the higher-grade material which would allow for a more refined mine plan.
Favorable results from the infill drilling confirmed the continuity of the copper mineralisation at key locations which enhances
confidence to the Measured category in the updated 2022 Mineral Resource estimate (MRE).
Table 1. Summary results for the updated MRE at MCB at a cut-off grade of 0.20% copper
Classification
Tonnes Copper Grade Gold Grade Copper Metal Gold Metal
(Mt)
(%)
(g/t)
(kt)
(kozs)
Measured
2
0.59
0.07
11
4
Weathered Indicated
7
0.56
0.09
41
22
Type
Inferred
0
0.38
0.12
0
0
9
0.57
0.09
53
26
Measured
45
0.59
0.19
263
277
Fresh
Indicated
242
0.43
0.11
1044
883
Inferred
42
0.52
0.11
218
153
Total
328
0.46
0.12
1525
1313
Measured
47
0.59
0.19
275
282
Combined Indicated
249
0.44
0.11
1085
904
Inferred
42
0.52
0.11
219
154
Total
338
0.47
0.12
1578
1340
Note: Estimates have been rounded to the nearest Mt of ore, two significant figures for Cu and Au grade, and
to the nearest kt of Cu metal and kozs of Au metal. Some errors may occur due to rounding.
Total
The Global Mineral Resource estimate is now 338 million tonnes of 0.47% copper, and 0.12g/t gold for a total of 1.6Mt of contained
copper and 1.3Mozs of contained gold reported to a preferred lower cutoff grade of 0.2% copper.
A further change to the MRE has been the inclusion of a small portion of weathered material which was not reported in the 2020
MRE. There is a potential to process weathered material from the surface stabilisation and surface infrastructure works as part of
the feasibility studies. Therefore, given the prospect for mining and processing of at least a portion of the weathered copper
mineralisation, it has now been included as part of the MCB Mineral Resource Estimate.
Community Development Program
Activities implemented for the period were concentrated on the remaining commitments under the approved Community
Development Program. These include the construction of infrastructure projects such as improvement of foot bridges, waiting sheds,
school hand-washing facility, public latrine, repairs of school roofs, among others. Livelihood trainings were also conducted to provide
an alternate source of income for the women in the community. Monthly meetings were also held to build and strengthen the
traditional leadership structure to manage and decide on challenges and concerns that affect the community. Financial support
continued to be extended to the community in observance of socio-cultural traditions as well as in times of calamities.
Environmental Work Program
Rehabilitation and revegetation of drill sites were completed not only to restore the land to its pre-drilling condition but also to
improve the land to its beneficial land use. Tree planting activities were carried out in adopted sites for the National Greening Program
and the Mining Forest Program.
6
DIRECTORS’ REPORT
Information, education, and communications campaigns were carried out to instill an environmentally conscious culture among the
employees and local hires.
Activities for the period closed out commitments under the approved Environmental Work Program and implemented in accordance
with the Department of Environment and Natural Resources (DENR) Administrative Order No. 2022-04 on Enhancing Biodiversity
Conservation and Protection in Mining Operations.
Forward Work
Following the completion of the exploration works, activities were focused on preparation for the hydrogeological and geotechnical
studies to support and firm up the mine design and surface infrastructure which include:
1.
Collection and monitoring of data from vibrating wire piezometer and water levels from holes drill in 2021 to 2022; and
2.
Procedural testing and calibration of equipment in preparation for the upcoming hydrogeological and geotechnical drilling
for additional ground stability.
Additional detailed surface mapping of outcrops near the proposed hydrogeological and geotechnical drill sites was also conducted
which resulted in updated surface geologic map and reports. Results of the activity have extended the mapped surface exposure of
the intrusive tonalite in the southern portion of the MCB ore body. These will be used to further support and correlate the drilling
results which delineated the near surface mineralisation at the eastern segment. Previous cross-sections were also re-interpreted
based on current drilling results in conjunction with the new surface data.
In anticipation of the permit issuance, an Engineering, Procurement, and Construction (EPC) scope has been issued to the contracting
market for early works and the main mine construction which is scheduled to commence towards the end of 2023.
Social, Environmental Licenses and Government Approvals
In support of the Declaration of Mining Project Feasibility (DMPF) application, all major plans and program were developed and
submitted in accordance with national government standards and consequently, the DMPF was approved on 27 September 2023
(see CLA Announcement dated 28 September 2023), the approval of which will trigger the forthcoming issuance of a mining permit
that will commence the pathway for the development of the MCB project.
Included in the requirements were securing social and government approvals. Through a Free, Prior and Informed Consent process,
a Memorandum of Agreement between the Company and the Balatoc Indigenous Community was signed on 14 November 2023
which signifies the collected decision of the host community to allow the development of the MCB Project for 25 years, renewable
for a further 25 years. Resolutions of support from concerned local government units have also been secured interposing no objection
to the development and operation of the MCB Project. These represent a social license to operate anchored on legitimacy, credibility
and trust which is crucial aspect for the project to be developed.
On 31 May 2023, the Department of Environment and Natural Resources (DENR) issued an Environmental Compliance Certificate
which indicates that an Environmental Impact Assessment has been carried out and certifies that the Company is committed to
implement a national government-approved environmental management plan aimed to protect and mitigate the anticipated social,
cultural, and environmental impacts in all phases and aspects of the MCB Project.
With these documents and approvals the Philippine Mines and Geosciences Bureau have indicated that the Company has complied
with all necessary requirements and has accordingly approved the Declaration of Mining Project Feasibility. Corresponding
Certificates of Approval for the key technical, social, and environmental plans and program have been issued which indicate that the
Company has instituted the necessary environmental and socio-economic sustainability measures, in accordance with national
standards, prior to the commencement of construction and mining operations for the life of the mine.
Table 2. Approved Technical, Social, and Environmental Plans and Programs
Key Documents
1.
Mining Project Feasibility
Study Report (MPFS)
2. Final Exploration Report
(FER)
3. Environmental Impact
Assessment (EIA) Report
Description
Assesses the technical and financial viability of the MCB Project
to advance it towards project development and operations by
tapping into its full potential.
Details the exploration works carried out in the MCB tenement
area from 2006-2013 and CY 2020 to 2021 which led to the
discovery of the MCB porphyry copper-gold deposit.
Identifies, assesses, and mitigates the likely environmental,
social, and economic impacts, both beneficial and adverse, of
the MCB Project as compared to baseline conditions.
Date of Approval
4 August 2023
(See CLA
Announcement
dated 15 August
2023)
15 September
2022
Environmental
Compliance
Certificate No.
ECC-CO-22120041 issued 29
May 2023
(See CLA
Announcement
7
DIRECTORS’ REPORT
Key Documents
4. Environmental Protection
and Enhancement Program
(EPEP)
5. Final Mine Rehabilitation
and/or Decommissioning
Plan (FMR/DP)
6. Care and Maintenance
Program (CMP)
7. Social Development and
Management Program
(SDMP)
Description
A comprehensive and strategic environmental management plan
for the life of the MCB Project. It contains the expected impacts,
mitigating measures, and commitments, including protection
and rehabilitation of the disturbed environment. It also serves as
an operational link between the environmental management
provisions of the Philippine Mining Act’s Implementing Rules and
Regulations and the conditions stated in the Environmental
Compliance Certificate issued to the MCB Project.
Considers all mine closure scenarios and cost estimates using
risk-based methodologies/ approaches. It covers the full extent
of work necessary to achieve the objectives of mine closure such
as, but not limited to decommissioning, rehabilitation,
maintenance, and monitoring.
Details the Company’s safety and health, social, and
environmental commitments as integral components of the MCB
Project in cases of operational constraints (i.e., voluntary or
involuntary stoppage).
A five-year program developed in consultation with the MCB
Project’s host and neighboring communities and aligned with
local development plans and global sustainable development
goals to bring about a sustained improvement in their living
standards.
Date of Approval
dated 31 May
2023)
Certificate of
Approval No.2112023-05 issued 12
July 2023
(See CLA
Announcement
dated 18 July
2023)
Certificate of
Approval No.2112023-05 issued 12
July 2023
(See CLA
Announcement
dated 18 July
2023)
Certificate of
Approval No. 0012023-CAR issued
22 March 2023
(See CLA
Announcement
dated 3 January
2023)
Certificate of
Approval No. 0312023-01-CAR
issued 4 May
2023
(See CLA
Announcement
dated 3 January
2023)
The approval of these key requirements is another step closer in the permitting process of achieving the Mineral Production Sharing
Agreement (MPSA) mining permit which the Company envisages receiving within the coming months.
As a pre-requisite to an MPSA application, MMCI entered into an initial binding deed and agreement with local companies to fund
approximately US$43 million for a 30% economic interest in the MCB Project. This is to satisfy the MPSA requirement for a 60%
Filipino legal ownership of the Company.
Regulatory Compliances
The conscientious implementation of the Exploration, Environment, Social, and Safety and Health Programs during the Exploration
stage has earned the Company high score during Mines and Geosciences Bureau Audit. All regulatory requirements were submitted
on schedule with no fines or penalties incurred and zero accidents/incidents since the issuance of the exploration permit. In
recognition thereof, the Company earned a Safety Mine Award for the Exploration Category during the 2022 Philippine Presidential
Mineral Industry Environmental Awards.
Sagay Copper-Gold Project, Philippines (100%)
Celsius Resources’ Philippine Subsidiary, Tambuli Mining Company, Inc.(“TMCI”) located in the northern part of Negros Island is
progressing the technical studies leading to the Declaration of Mining Project Feasibility which will trigger the application and
approval of a mining permit during 2024.
Exploration Work Program
Exploration works for the period focused on desktop reviews of previous drilling results in conjunction with exploration data for the
reinterpretation of geologic and mineralisation models to improve exploration and future development strategies.
The results of the desktop studies were the basis for the JORC-compliant maiden mineral resource estimate which is categorised into
three Ore Domains:
•
High Grade Copper Domain (100HG)
•
Low Grade Copper Domain (100LG)
8
DIRECTORS’ REPORT
•
Supergene Enrichment Domain (900SG)
The reported global Indicated and Inferred Maiden Mineral Resource for the Nabiga-a Hill deposit is 302 million tonnes at 0.41%
copper, and 0.11g/t gold, with total contained metals of 1,244 kt Cu and 1,046 kozs Au. A summary of the results is reflected in the
table below:
Results of the additional desktop studies and the mineral resource estimates suggested the necessity to shift focus on the shallow
high-grade supergene chalcocite zone (Ore Domain 900SG). With this, a test pitting activity was implemented to collect the necessary
ore samples for a preliminary metallurgical test work. This will allow the development of a thorough process flow that will provide
an empirical basis for the mine plan, process flow sheet, and financial studies which are critical components of the project’s economic
viability.
To gain more confidence in the resource classification for the chalcocite ore zone (900SG), a new drilling campaign is proposed to
increase the resource classification from Inferred to Indicated.
The outcome of the resource drilling and core sample assays will feed into an updated resource model and mineral resource estimate
which will be the basis for future development studies.
Technical studies are ongoing to assess the technical and financial viability of the Sagay Project for a Phased approach where Phase
1 will develop the shallow chalcocite zone (900SG) with a low CAPEX model, small-scale operation, and Phase 2 for the large-scale
copper mineralisation at deeper levels using the cashflow from Phase 1.
In parallel, implementation of Environmental and Community Development Programs is being fast-tracked to fulfill the remaining
commitments within the term of the exploration permit. Preparations are also underway for the development of social and
environmental plans and programs to support the application for a Declaration of Mining Project Feasibility which is anticipated to
be submitted by December 2023.
Opuwo Cobalt-Copper Project, Namibia (Celsius – 95%)
The Opuwo Cobalt Project held under Celsius’ Namibian subsidiary Opuwo Cobalt Holdings (Pty) Ltd., continues to progress its
metallurgical test works for optimization to further refine the cobalt and copper recoveries that will feed into the engineering design
criteria.
The Project’s tenement permits expired in March 2023. The Company has lodged the necessary documentation for permit renewal
with favourable feedback from the Ministry of Mines.
Metallurgical Work Program
A total of seven tests were undertaken on various collectors, including five sets of roasting and 10 subsequent leaching tests to
optimize retention times, operating temperatures and reagent consumptions.
Results will be utilised as input criteria to develop a processing flowsheet which will be the basis for an Economic Scoping Study
planned later in 2023.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
The Directors are not aware of any other significant change in the state of affairs of the consolidated entity that occurred during the
financial year other than as reported elsewhere in the Annual Report.
FINANCIAL POSITION
The net assets of the consolidated entity have increased to $35,162,833 as at 30 June 2023, an increase of $7,963,173 from net assets
of $27,199,660 at 30 June 2022.
9
DIRECTORS’ REPORT
The consolidated entity’s net working capital is $4,631,538 (2022: -$1,270,197).
EVENTS AFTER THE REPORTING PERIOD
In July and August 2023, the Company issued a total of 35,000,000 fully paid ordinary shares on exercise of 35,000,000 unlisted
options over shares, each option exercisable at $0.012 and expiring on 4 August 2023.
On 18 July 2023, the Company’s Philippine subsidiary, Makilala Mining Company, Inc. was issued a Certificate of Approval for its
Environmental Protection and Enhancement Program and Final Mine Rehabilitation and/or Decommissioning Plan for its MaalinaoCaigutan-Biyog (MCB) Copper-Gold Project. On 15 August 2023, the Philippine Mines and Geosciences Bureau approved the MCB
Project’s Mining Project Feasibility Study as technically and economically feasible based on provisions of the Philippine Mining Act of
1995. Following this approval is the anticipated issuance of the MCB Project’s Declaration of Mining Project Feasibility and
consequently, the Mineral Production Sharing Agreement, which the Company envisages receiving towards the end of 2023.
On 11 August, 4,400,000 unlisted Performance Rights expired without exercise or conversion. This was due to the vesting condition
of the Declaration of Mining Project Feasibility for the Sagay Project being received by 11 August 2023 not being met.
On 11 August 2023, the Company announced that the proposed transaction with Silvercorp Metals Inc. (SVM) did not have reasonable
prospects of being approved by the requisite majorities of shareholders at the initial proposed price, and the Company formed the
view that SVM does not intend on progressing with the transaction. As of the date of this report, the Company has not received any
formal notice from SVM terminating the proposed transaction. The exclusivity clauses in the agreement assigned with SVM have
expired.
On 15 August 2023, the Company announced that the Philippine Mines and Geosciences Bureau (“Bureau”) approved the MCB
Project’s Mining Project Feasibility Study as technically and economically feasible based on provisions of the Philippine Mining Act of
1995. This followed with an announcement on 28 September 2023, confirming the Bureau had issued the approval of the Declaration
of Mining Project Feasibility, which is the last step in the permitting process towards the achievement of the MCB Project’s mining
permit.
The Directors are not aware of any other matters or circumstances that have arisen since the end of the financial year which
significantly affected or may significantly affect the operations of the consolidated entity the results of those operations, or the state
of affairs of the consolidated entity in future financial years.
LIKELY DEVELOPMENTS
The Directors believe, on reasonable grounds, that to include in this report particular information regarding likely developments in
the operations of the company and the expected results of those operations in future financial years would be speculative and likely
to result in unreasonable prejudice to the company. Accordingly, this information has not been included in this report.
ENVIRONMENTAL REGULATION
The Company’s operations are not regulated by any significant environmental regulation under a law of the Commonwealth or of a
State or Territory. The Directors have considered the enacted National Greenhouse and Energy Reporting Act 2007 (the “NGER Act”)
which introduces a single national reporting framework for the reporting and dissemination of information about the greenhouse
gas emissions, greenhouse gas projects, and energy use and production of corporations. At the current stage of development, the
Direct
Share your feedback
Discover