HIGHLIGHTS
•
Focus of the update related to shallow supergene copper mineralisation which now
includes Measured and Indicated Mineral Resources.
•
Combined Measured, Indicated and Inferred Mineral Resource of 312 million
tonnes @ 0.39% copper and 0.11g/t gold.
•
Global Resource remains largely unchanged with ~1.2 million tonnes of contained
copper and ~1 million ounces of contained gold.
•
The copper mineralisation remains open in multiple directions, with further shallow
targets untested.
•
Mineralisation exists from near surface down to over 1.2km depth with strike
lengths up to 1km and true widths extending into the 100’s of metres.
______________________________________________________________________________
Celsius Resources Limited (“Celsius” or “the Company”) is pleased to announce an updated
JORC compliant Mineral Resource estimate (“MRE”) for the Sagay Copper Project (“Sagay” or
“Project”), held under its Philippine Subsidiary, Tambuli Mining Company, Inc (“TMCI”) and
located at the Island of Negros in the Philippines.
The update to the MRE at Sagay is largely based on the results from the 2023 drilling program
at a shallow copper position located ~500m to the west of the main body of mineralisation
discovered to date, as announced on 17th October 2023. This shallow copper zone offers Celsius
the opportunity to investigate a low cost start up opportunity via a feasibility study which has
been submitted to the Philippine Government.
Celsius Resources Managing Director, Peter Hume said:
“The greater definition of the shallow supergene copper at Sagay has increased both the
Resource category and our own confidence in the ability to look at a new shallow sustainable
friendly development option. The previous Mineral Resource 1 only placed this area in the Inferred
Category, and with this new update to the Mineral Resource, this area is now largely in the
Measured and Indicated category, which allowed us to complete and submit a feasibility study to
the Philippine Government 2.
1
Refer to ASX/AIM announcement dated 7 November 2021 “Maiden Mineral Resource estimate (MRE) for the Sagay Project”
2
Refer to ASX/AIM announcement dated 8 January 2024 “Celsius’ Sagay Project applies for DMPF”
Level 5, 191 St. Georges Terrace, Perth WA 6000 PO Box 7059, Cloisters Square PO, Perth WA 6850
P: +61 2 8072 1400 E: info@celsiusresources.com.au W: celsiusresources.com
The Company has taken a sustainable approach to the proposed development of the Sagay
Mineral Resource, similar to its flagship MCB project. Eliminating the use of a conventional
tailings dam and using the tailings for environmental rehabilitation, along with processing the ore
through gravity separation, therefore eliminates the use of chemicals. We are in the process of
finalising the Project’s environmental impact assessment which will clearly demonstrate the
Company’s commitment to environmental protection and preservation through advanced mining
technologies.”
CLA Chairman, Atty. Julito R. Sarmiento added:
“The development of the Sagay Project can assist with meeting the global demand for green
metals in an effort to transition to clean energy sources and achieve the global goal of net zero
emissions by 2050 to stave off climate change calamity. CLA constantly takes serious efforts to
develop genuinely responsible projects by tightening up our environmental managements
systems and stepping up our social and environmental performance.”
THE SAGAY COPPER-GOLD PROJECT
Location
The Sagay Copper Project is in the north-eastern part of Negros Island, within the cities of Sagay
and Escalante in the Province of Negros Occidental, Philippines (Figure 1). Negros Island is part
of the central group of Islands in the Philippines commonly referred to as “the Visayas”.
Figure 1. Location of the Sagay Copper Project in the Island of Negros, Visayas, Philippines
ASX RELEASE | PAGE 2
The MRE for the Sagay Property is located at Purok Tan-ao, Barangay Lopez Jaena (see Figure
2).
Figure 2. Location of the tenement area of the Sagay Project.
Mineral Resource Estimate
Drilling at Sagay has broadly defined a large-scale copper mineralisation which is interpreted to
be a typical porphyry copper style of mineralisation, common throughout the Philippine
archipelago.
The copper mineralisation for the MRE at Sagay is defined by three defined mineralised
domains, two of which (namely 100LG and 100HG) relate to a main body of copper
mineralisation which exists underneath a local topographic high.
This topographic high relates to Purok Tan-ao with resistive siliceous rocks interpreted to be an
eroded lithocap associated with the porphyry mineralisation.
A third mineralised domain (900SG) hosts a shallow flat lying supergene copper mineralisation
towards the west of the main mineralisation underneath Purok Tan-ao and is possibly related to
ASX RELEASE | PAGE 3
a satellite porphyry mineralisation. Figures 3 to 7 show a plan view and cross sections of the
mineralised domains relative to the host rock geology.
The copper mineralisation at Purok Tan-ao is broadly constrained by a zone of mineralisation
which exceeds 0.2% copper and is trending parallel to the main alteration and related intrusive
host rocks.
A lower cut-off grade of 0.2% copper was applied in the reported MRE (summarised in Table 1)
which aligns broadly with the expected economic limits of the likely mining and processing
options considered at Purok Tan-ao.
Table 1: Summary results for the Mineral Resource estimate at Purok Tan-ao at a cut-off grade of 0.20%
copper.
Domain
Classifiaction Weathering
Measured
Supergene
900 SG
Indicated
Inferred
100HG
Primary
100LG
Combined
TOTAL
Indicated
Inferred
Indicated
Inferred
Measured
Indicated
Inferred
TR
FR
TR
FR
TR
FR
FR
FR
FR
TR
FR
Tonnes
(Mt)
0.4
0.1
4.6
1.7
0.9
0.2
8.3
52
7.1
0.9
236
0.5
22
290
321
Copper Gold Copper
Grade Grade Metal
(%)
(kt)
(g/t)
1.9
0.49
0.02
0.29
0.02
0.2
0.53
0.03
25
8.2
0.48
0.03
0.02
4.2
0.46
1.1
0.59
0.02
0.57
0.15
47
0.57
0.15
296
0.3
0.07
21
0.05
2.2
0.24
0.35
0.1
818
0.46
0.02
2.1
0.47
0.09
101
0.39
0.11
1,122
0.11
1,225
0.39
Gold
Metal
(kozs)
0.3
0
3.7
1.5
0.5
0.1
39
244
16
1.6
768
0.3
60
1,014
1,075
Note for table of results: Calculations have been rounded to the nearest Mt of ore (to the nearest 100,000t where
<10Mt), two significant figures for Cu and Au grade and to the nearest kt of Cu metal and kozs of Au metal (to the
nearest 100t where <10kt). Some apparent errors may occur due to rounding. TR – Transition or partially oxidised Rock,
FR – Fresh Rock.
ASX RELEASE | PAGE 4
Figure 3. Drill hole locations and interpreted surface geological plan view diagram.
Figure 4. Drill hole locations and interpreted surface geological plan view diagram.
ASX RELEASE | PAGE 5
Figure 5. Oblique Cross Section A-A’ , showing the location of mineralised domain 900SG (Supergene
mineralisation) and the western section of the 100LG and 100HG mineralised domains.
Figure 6. Oblique Cross Section B-B’ showing the location of the 100LG and 100HG mineralised
domains.
ASX RELEASE | PAGE 6
Figure 7. Oblique Cross Section C-C’ showing the location of the 100LG and 100HG mineralised
domains.
Geology and Geological Interpretation
Sagay is located at the northernmost tip of the NNE trending volcanic arc related to the eastward
subduction beneath the Negros Trench in the southwest offshore of Negros Island. Several
porphyry and epithermal mineralisation targets belong in this underexplored mineralisation
trend along the eastern side of the island.
The major rocks identified at Purok Tan-ao are a series of intermediate igneous rocks intruding
into older host rocks composed of basalts overlain by metamorphosed sedimentary rocks and
felsic volcanics. These rocks are in turn overlain by Quaternary pyroclastic rocks that consist of
tuff and tuff breccias. The intermediate intrusions include several diorites and andesite porphyry.
Three distinct Diorite intrusives were identified. Following the local nomenclature in Sagay
Project, these are (from oldest to youngest) the (1) Equigranular Diorite (MEQ), (2) Mediumgrained Porphyritic Diorite (MPOC), and the (3) Fine-grained Equigranular Diorite (FEQ). These
intrusive rocks have distinct textures and visible cross cutting relationships. Widespread strong
silica - clay and outer chlorite alteration is notable in the deposit. This 8km by 4km alteration
zone is indicative of a large magmatic hydrothermal system.
There are multiple types of porphyry mineralisation observed within the Purok Tan-ao Deposit.
The dominant type is related to early-stage porphyry quartz stockwork veins with associated
potassic alteration and chalcopyrite as the dominant copper sulphide. A later-stage porphyry
Cu-Mo type mineralisation has been identified and is hosted in silica – sericite – chlorite
alteration. In addition, evidence exists for a later-stage epithermal vein deposit type which exist
within close proximity to the large-scale porphyry copper-gold mineralisation.
At this stage, only the porphyry copper-gold type of deposit was defined in the MRE.
ASX RELEASE | PAGE 7
Drilling Techniques
All of the drilling data used for the Sagay MRE is based on diamond drilling information from a
total of 45 diamond drill holes—with a cumulative meterage of 25,782.1m.
Initial diamond drilling was conducted between December 2012 and 2016 by FreeportMcMoRan, who completed a total of 28 drill holes at Purok Tan-ao, with an aggregate core depth
of 22,516.70 metres.
From November 2021 to April 2022, Celsius has completed a total of 4 drill holes and 1 offset,
for a total to 2,440 metres 3. More recently in late 2023, Celsius completed a further 12 shallow
drill holes which are the focus for this Mineral Resource update. These shallow drill holes relate
to the 900SG mineralised domain with a total meterage of 824.7m 4.
Sampling and Sub-sampling Techniques
The following sub sampling and sample preparations were followed for all the diamond drilling
at Sagay.
Half core samples were collected from diamond holes drilled from the surface. All drill cores
were generally sampled at 2m intervals. In cases where geological and mineralogical
characteristics change, the sample length is reduced to best fit the geological contact, with a
minimum observed sample size of one metre. Sampling typically commenced after the
overburden horizon depth was exceeded.
Cut samples were bagged on site prior to delivery to the laboratory (Intertek) in Manila for
sample preparation and analysis.
Sample Analysis Method
All samples were analysed at the Intertek, an internationally recognised and ISO/IEC
17025:2005 & ISO/IEC 17020:2004 certified independent laboratory in Manila.
Copper (Cu) values were analysed by means of multi-acid (4-acid) digest. Elements were
determined by ICP-OES/MS with AAS finish. Samples were fire assayed for gold (Au) using a 50gram charge, with a detection limit of 0.005 ppm.
Estimation Methodology
A parent cell block size of 10m x 10m x 10m was chosen based on the general dimensions of
the interpreted ore domains, and the likely mining method.
Ordinary Kriging was chosen as the interpolation method for the block model which defines the
MRE.
The parameters for Ordinary Kriging were based on an analysis of the variograms for each
domain in addition to some broad assumptions with regards to the direction and continuity of
the copper and gold mineralisation associated with each defined mineralised domain. The
variograms were located along the plane of the interpreted controlling geological trend which
is striking at approximately 50 degrees at a near vertical dip.
A broad review of the statistics for each domain did not identify significant high value outliers
that are considered likely to result in an overestimated either locally or globally to the grade
distribution within the block model. Therefore, no top cut was applied to the MRE.
3
Refer to ASX/AIM Announcement dated 23 June 2022 “Celsius confirms copper near surface at Sagay Project”
4
Refer to ASX/AIM Announcement dated 17 October 2023 “Shallow Copper Results from Sagay”
ASX RELEASE | PAGE 8
Classification Criteria
The mineralisation is constrained within boundaries which are also considered to define the
limits for each domain as supported by the current drill hole information. Within these domain
constraints, minimum search distances and composited drill hole information parameters
determined which locations were defined as Measured, Indicated, Inferred or as further
Exploration Targets.
A small portion of the 900SG was classified in the Measured category where there is tighter drill
spacing (less than 50m), multiple drill holes which show continuity of mineralisation and the
variogram analysis is also supporting of the relationship of the assay data between drill holes.
The Indicated category was classified based on maximum distance of 150m to the major
position, 85m to the semi-major axis and 25m in the minor direction for the limits, with a
minimum number of samples at 8 and maximum number of samples at 16. A minimum of two
drill holes was also applied for the Indicated category.
The Inferred Mineral Resource represents over 90% of the total MRE due to the thick and
broadly spaced copper intersections as deeper levels which contain the most copper
mineralisation identified to date at Purok Tan-ao. This category was extended for twice the
distances applied to the Indicated Resource pushing the limits search ellipse to 300m x 150m x
50m, with a minimum of four samples and maximum of 20 samples defined for each block.
No restriction on the number of drill holes was applied for the Inferred Mineral Resource
category.
Cut-off Grade
A preferred lower cut-off grade of 0.2% copper has been used in the reported MRE. This is
considered appropriate based on the geological continuity associated with copper
mineralisation above 0.2% copper in addition to a broad economic cut-off point based on a
~US$10,000/t copper price.
Dimensions
The mineralisation at Purok Tan-ao is classified as a porphyry copper-gold deposit which, at
deeper levels (below 400m depth), has a broad geometry of up to 1km along strike towards the
north-east (with a main trend of ~45o azimuth) and true widths of up to 280m. At shallower levels,
the copper mineralisation is broken up into multiple domains which are individually up to 600m
along strike and with true widths of up to 150m.
The 900SG domain is a shallow, flat lying zone of mineralisation which has formed along the
current and ancient water table at a broadly horizontal orientation. This domain is elongated in
the direction of some interpreted controlling faults and/or source porphyry copper
mineralisation. These trends appear to be both north-east and north-west in orientation.
Metallurgical and Mining Parameters
For the 900SG domain which is the basis of the Feasibility Study, utilised a potential surface mine
approach with an interpreted costs of US$3.30/t for mining and US$4.8/t for processing.
Possible later mining development costs of US$10/t to US$7/t and processing costs of US$7/t
to US$4/t respectively for a medium sized (5Mt to 10Mt per annum) underground block caving
ASX RELEASE | PAGE 9
mining method and processing using floatation (to produce a copper-gold concentrate) have
been assumed where applicable for the MRE.
This cost range estimate matches closely with a broad geological cut-off grade of between
0.15% copper and 0.25% copper (at a forward-looking Copper Price of ~US$10,000/t).
Study Results
Based on the resource model, mining parameters, and metallurgical test works, a Mining Project
Feasibility Study was submitted to the Philippine Mines and Geosciences Bureau on 20
December 2023 confirming the presence of minerals in the area which are recoverable by
processing the ore through gravity separation which was determined to be economically sound,
ensuring environmental protection and preservation methods would be implemented through
the advanced mining technologies 5.
The study focused on the shallow supergene chalcocite deposit which is suitable for a mediumscale surface mining operation. The copper concentrate produced will have no deleterious
elements which makes it highly marketable.
Technical, environmental, and social considerations were incorporated in the mine design to
reduce the mine footprint to approximately 20 hectares. The process plant is engineered to
enhance the ore through a gravity concentration method which is effective in extracting valuable
components form the ore, thus contributing to the overall success of the ore beneficiation
process.
Metallurgical test works indicated that the tails produced is non-acid generating. All tailings will
be managed through dry stacking method which eliminates the need for a tailings dam, thus
removing the possibility of environmental impacts (tailings spill). Other alternative disposal
methods are currently being studied, including the potential use of tailings for hollow block
manufacturing as a community livelihood program, road base, and landfill among others.
Next Steps
Following the submission of the DMPF, the key technical, environmental, and social plans and
programs are under review by the Philippine Government. Once approved, the Company will
apply for a mineral agreement with the government.
Listing Rule 5.19 and 5.23 Disclosure
The information is this announcement with respect to the MRE for the Sagay Project was first
announced by the Company to ASX on 7 November 2022. Where reference is made to previous
announcements of exploration results in this announcement, the Company confirms that it is not
aware of any new information or data that materially affects the information and results included
in the original market announcements and that all material assumptions and technical
parameters underpinning the MRE continue to apply and have not materially changed.
5
Refer to ASX/AIM announcement dated 8 January 2024 “Celsius’ Sagay Project applies for DMPF”
ASX RELEASE | PAGE 10
Forward Looking Statements
Some of the statements appearing in this announcement may be in the nature of forwardlooking statements. You should be aware that such statements are only predictions and are
subject to inherent risks and uncertainties. Those risks and uncertainties include factors and risks
specific to the industries in which the Company operates and proposes to operate as well as
general economic conditions, prevailing exchange rates and interest rates and conditions in the
financial markets, among other things. Actual events or results may differ materially from the
events or results expressed or implied in any forward-looking statement.
No forward-looking statement is a guarantee or representation as to future performance or any
other future matters, which will be influenced by a number of factors and subject to various
uncertainties and contingencies, many of which will be outside the Company’s control.
The Company does not undertake any obligation to update publicly or release any revisions to
these forward-looking statements to reflect events or circumstances after today's date or to
reflect the occurrence of unanticipated events. No representation or warranty, express or
implied, is made as to the fairness, accuracy, completeness or correctness of the information,
opinions or conclusions contained in this announcement. To the maximum extent permitted by
law, none of the Company’s Directors, employees, advisors, or agents, nor any other person,
accepts any liability for any loss arising from the use of the information contained in this
announcement. You are cautioned not to place undue reliance on any forward-looking
statement. The forward-looking statements in this announcement reflect views held only as at
Competent Persons Statement
Information in this report relating to the reporting of Mineral Resource Estimates and Exploration
Results is based on information compiled, reviewed and assessed by Mr. Steven Olsen, who is a
Member of the Australasian Institute of Mining and Metallurgy and the Australian Institute of
Geoscientists. Mr. Olsen is an Employee of Global Geologica, an independent consulting
Company to Celsius Resources Limited, and has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined by the 2012 Edition of the Australasian
Code for reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Olsen
consents to the inclusion of the data in the form and context in which it appears.
This announcement has been authorised by the Board of Directors of Celsius Resources Limited.
The information contained within this announcement is deemed by the Company to constitute
inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it
forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018.
ASX RELEASE | PAGE 11
Celsius Resources Contact Information
Level 5, 191 St. Georges Terrace
Perth WA 6000
PO Box 7059
Cloisters Square PO
Perth WA 6850
P: +61 2 8072 1400
E: info@celsiusresources.com.au
W: www.celsiusresources.com
Celsius Resources Limited
Peter Hume
(Managing Director)
Multiplier Media
Jon Cuthbert
P: +61 2 8072 1400
E: info@celsiusresources.com.au
W: www.celsiusresources.com
M: +61 402 075 707
E: jon.cuthbert@multiplier
Beaumont Cornish Limited
(Nominated Adviser)
Roland Cornish/Felicity Geidt/Andrew Price
P: +44 (0) 207 628 3396
E: corpfin@b-cornish.com.uk
WH Ireland (Broker)
Harry Ansell/James Joyce/Isaac Hooper
P: +44 (0) 20 7220 1666
Beaumont Cornish Limited (“Beaumont Cornish”) is the Company’s Nominated Adviser and is authorised and
regulated by the FCA. Beaumont Cornish’s responsibilities as the Company’s Nominated Adviser, including a
responsibility to advise and guide the Company on its responsibilities under the AIM Rules for Companies and AIM
Rules for Nominated Advisers, are owed solely to the London Stock Exchange. Beaumont Cornish is not acting for and
will not be responsible to any other persons for providing protections afforded to customers of Beaumont Cornish nor for
advising them in relation to the proposed arrangements described in this announcement or any matter referred to in it.
ASX RELEASE | PAGE 12
Appendix 1: The following tables are provided to ensure compliance with the JORC Code (2012)
requirements for the reporting of Exploration Results for the MCB Project.
SECTION 1:
Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (e.g.,
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as down whole gamma sondes,
or handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
• Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where
‘industry standard’ work has been
done this would be relatively simple
(e.g., ‘reverse circulation drilling was
used to obtain 1 m samples from
which 3 kg was pulverised to
produce a 30 g charge for fire assay’).
In other cases, more explanation may
be required, such as where there is
coarse gold that has inherent
sampling problems.
Drilling
techniques
• Drill type (e.g., core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter,
triple or standard tube, depth of
diamond tails, face-sampling bit or
other type, whether core is oriented
and if so, by what method, etc).
Commentary
• Samples were collected from diamond
core drilled from the surface. All drill core
was generally sampled on 2-meter
intervals. In cases where geological and
mineralogical characteristics change,
sample length was not less than 1 meter.
• Core samples cut into half using diamond
core saw following the cutting lines
marked by the Geologist. Split cores
returned to its respective core tray.
• Samples were shipped by company
vehicle to Intertek Testing Services which
is an external laboratory located in
Manila, Philippines.
• Crushed samples were fire assayed for
gold (Au) using a 30-gram charge, with a
detection limit of 0.005 ppm. Gold values
greater than 50 ppm were determined by
gravimetric fire assay.
• Copper (Cu) values were assayed using
four-acid digestion. Elements
determined by ICP-OES/MS with AAS
finish with final reporting for a total of 36
elements.
• Previous exploration and drilling were
conducted between December 2012 and
2016 by Freeport-McMoRan, completing
a total of 28 drill holes for the Purok Tanao deposit, with an aggregate depth of
22,516.70 meters.
• A further exploration program had
commenced between November 2021 to
April 2022, completing a total of 4 drill
holes and 1 offset hole in the prospect,
with a cumulative depth of 2,440.70
meters.
• The most recent drilling program was
completed in late 2023 with 12 shallow
diamond drill holes for a total length of
824.7m
ASX RELEASE | PAGE 13
Criteria
JORC Code explanation
Commentary
• There are a total of 45 holes in the
database used for the MRE which is the
subject of this release for a cumulative
depth of 25,782.1 meters.
• The core drilling utilised a triple-tube
core barrel from collar to end-of-hole to
ensure optimum core recovery, with the
deepest hole drilled being 1,400 meters.
Drill sample
recovery
• Method of recording and assessing
core and chip sample recoveries and
results assessed.
• Core recovery has been recorded for
every interval as part of the routine
geomechanical logging.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Recovered core lengths on average were
measured to be over 97% for the drill
holes with form part of the MRE,
indicating a high recovery and minimal
lost core.
• Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential
loss/gain of fine/coarse material.
Logging
• Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of
the relevant intersections logged.
• All drilling activities were supervised by
company Geologists. Trained Core house
technician were responsible for the core
recovery determination.
• Geologists were tasked to oversee the
daily quick log report down to sampling.
Daily quick log form was completed to
identify the geological details such as
lithology, alteration and mineralisation
with corresponding percentage estimate
of Cu minerals and Cu grade, using an
established geological code.
• Detailed logging proceeds describing
geological characteristics present in the
core, i.e. lithology, alteration, mineralogy,
structures, etc.
• Core photography was undertaken after
completing the geomechanical logging.
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core
taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
ASX RELEASE | PAGE 14
• Samples were routinely taken over a 2m
interval, and cut in half, with half of the
drill core sent for analysis and half of the
drill core retained for future reference.
• Samples were cut on site using a hand
core saw. Samples were then selected
and bagged on site prior to delivery to
the laboratory (Intertek) in Manila for
sample preparation.
• The sample size is considered
appropriate for type of material being
samples.
Criteria
JORC Code explanation
Commentary
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make
and model, reading times,
calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and precision have been established.
• Samples were fire assayed for gold (Au)
using a 30-gram charge, with a detection
limit of 0.005 ppm. Gold values greater
than 50 ppm were determined by
gravimetric fire assay. Copper (Cu) values
were assayed using four acid digestion.
Elements determined by AAS finish.
• The procedures for the submission of
samples to the laboratory also include
the regular insertion of QA/QC samples
in every transmittal form or batch, which
was typically delivered to the laboratory
in batches of 50 numbered samples. For
each batch of 50 samples a total of 43
came from core samples and an
additional 7 samples were included for
QA/QC check