Further High-Grade Intercepts
Determined
HIGHLIGHTS
• Drilling results from current drilling program highlight high-grade intercepts of
86.0 m @ 0.56 % Cu and 0.06 g/t Au from 16.0 m, including 16.0 m @ 1.26% Cu
and 0.06 g/t Au from 16.0 m.
• Feasibility Study update work now 60% complete.
_______________________________________________________________________________
Celsius Resources Limited (“Celsius” or the “Company”) (ASX, AIM: CLA) and its
Philippines affiliate company Makilala Mining Company, Inc. (“MMCI”) is pleased to
announce additional results from the drilling program which commenced in June this
year.
The drilling program is focused on geo-technical and hydro-geological drilling and
additional metallurgical test work. As stated by Peter Hume, our Technical Director, “This
recent drill hole was completed to provide additional mine design and geo-technical
data. With these new higher-grade intercepts, the Board have further confidence that
the final mine plan, will deliver the best value for the MCB Project, our investors, share-
holders and the community”.
The feasibility study update continues on schedule and is now more than 60% complete.
Work on the final mine design is almost completed along with the 3D layout for the pro-
cess plant and site infrastructure.
Upon all assays being received from the drilling program, the Company expects to re-
lease an updated Mineral Resource Estimate (MRE) followed by a JORC Ore Reserve
Statement. These additional statements are expected to be announced along with the
updated JORC Feasibility Study report by December this year.
ASX/AIM RELEASE | PAGE 2
Figure 1. Location of drill hole MCB-UG-001 relative to recent and historical diamond
drilling at MCB.
Drilling Results
The recently completed drill hole returned results that were higher than anticipated
when compared to the resource model, confirming the presence of consistent high-
grade copper mineralisation. The assays received to date cover the interval up to 102.0
metres downhole. Within this section, the hole intersected a continuous interval of 86.0
metres from 16.0 metres downhole, grading 0.56% Cu and 0.06 g/t Au, including
a higher-grade zone of 16.0 metres from 16.0 metres grading 1.26% Cu and 0.06
g/t Au. The drill hole extended to a total depth of 450.1 metres. Assay results for the
significant remaining interval, from 102.0 metres to 450.1 metres, are pending and will
be released to the market once they have been received and validated. These results
provide strong support for the robustness of mineralization within the targeted zone and
will be incorporated into future resource evaluation.
ASX/AIM RELEASE | PAGE 3
Table 1. Significant intersection from drill hole MCB-UG-001.
Hole ID East North RL Dip Azi
Drillhole
Depth
(m)
Depth
From
(m)
Depth
To(m)
Length
(m)
Cu (%) Au (g/t)
MCB-UG-
001
293995 1918733 925 280 -60 450.1 16 102 86 0.56 0.06
including 16 32 16 1.26 0.06
Figure 2. Cross section (see location at Figure 1) showing drill hole MCB-UG-001 in
proximity to historical diamond drilling, highlighting significant assay results (looking
northeast)1
.
MCB COPPER-GOLD PROJECT
The MCB Copper-Gold Project (MCB) is located in the Cordillera Administrative Region
in the Philippines, approximately 320km north of Manila (Figure 1). It is the flagship pro-
ject within the Makilala portfolio which also contains other key prospects in the pipeline
for permit renewal/extension.
1 ASX announcement 16 September 2020 (MCB-003, MCB-008 and MCB-019, ASX announcement 19 October 2022 (MCB-041),
ASX announcement 4 October 2022 (MCB-040), ASX announcement 3 August 2022 (MCB-039), ASX announcement 4 July 2022
(MCB-038), ASX announcement 23 May 2022 (MCB-037), ASX announcement 13 December 2021 (MCB-036).
ASX/AIM RELEASE | PAGE 4
An updated JORC compliant Mineral Resource Estimate was announced for the MCB
Project on 12 December 2022, comprising 338 million tonnes @ 0.47% copper and 0.12
g/t gold, for a total of 1.6 million tonnes of contained copper and 1.3 million ounces of
gold, of which 249 million tonnes @ 0.44% copper and 0.11 g/t gold is classified as In-
dicated, 42 million tonnes @ 0.52% copper and 0.11 g/t gold is classified as Inferred,
and 47 million tonnes @ 0.59% copper and 0.19 g/t gold is classified as Measured.
A Study for the MCB Project was announced by CLA on 1 December 2021, which iden-
tified the potential for the development of a copper-gold operation with a 25-year mine
life. The Study was based on an underground mining operation and processing facility
to produce a saleable copper-gold concentrate.
Highlights from the Study include a Post tax NPV (8%) of US$464m and IRR of 31%, as-
suming a copper price of US$4.00/lb and gold price of US$1,695/oz. Initial capital ex-
penditure is estimated to be US$253m with a payback period of approximately 2.7
years. The designed mine production is matched to a 2.28Mtpa processing plant which
will treat ore with an estimated average grade of 1.14% copper and 0.54g/t gold for the
first 10 years of planned production with a C12
cash costs at just US$0.73/lb copper, net
of gold credits.
Please note that as at the date of this announcement there are studies ongoing to
update the Feasibility Study for the MCB Project and to complete the Front-end Engi-
neering and Design. These studies are scheduled for completion before December
20253
.
2
C1 costs include all direct costs in mining, processing, general and administration, and selling (including freight).
3 ASX/AIM announcement 7 August 2025
ASX/AIM RELEASE | PAGE 5
Figure 3. Location of the MCB Project in the province of Kalinga, Northern Luzon, Phil-
ippines.
This announcement has been authorised by the Board of Directors of Celsius Resources
Limited.
The information contained within this announcement is deemed by the Company to
constitute inside information as stipulated under the Market Abuse Regulations (EU) No.
596/2014 as it forms part of UK Domestic Law by virtue of the European Union (With-
drawal) Act 2018.
Listing Rule Disclosures
The Company confirms that it is not aware of any new information or data that relates to
Exploration Results and Mineral Resources at the MCB Project and that all material
ASX/AIM RELEASE | PAGE 6
assumptions and technical parameters underpinning the Mineral Resource continue to
apply. The Mineral Resource Estimate for the MCB Project referred to in this announce-
ment was first disclosed in accordance with the requirements of ASX Listing Rule 5.8 in
the Company’s ASX Announcement dated 12 December 2022 titled “Updated Mineral
Resource for Celsius’ MCB Copper-Gold Project”. The Company confirms that it is not
aware of any new information or data that materially affects the information included in
the previous announcement and that all material assumptions and technical parameters
underpinning the Mineral Resource Estimate continue to apply and have not materially
changed. Please note that as at the date of this announcement there are studies ongo-
ing to update the Feasibility Study for the MCB Project which are scheduled for comple-
tion by December 2025.
The information in this announcement at footnote 2 relates to exploration results that
have been previously released to ASX. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the original
ASX announcement and that all material assumptions and technical parameters con-
tinue to apply.
Qualified / Competent Person Statement
Information in this report relating to Exploration Results is based on information com-
piled, reviewed and assessed by Mr. Steven Olsen, who is a Member of the Australasian
Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr. Olsen
is a consultant to Celsius Resources and has sufficient experience which is relevant to
the style of mineralization and type of deposit under consideration and to the activity
which he is undertaking to qualify as a Competent Person as defined by the 2012 Edition
of the Australasian Code for reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr. Olsen consents to the inclusion of the data in the form and context in
which it appears.
Forward Looking Statements
Some of the statements appearing in this announcement may be in the nature of for-
ward-looking statements. You should be aware that such statements are only predic-
tions and are subject to inherent risks and uncertainties. Those risks and uncertainties
include factors and risks specific to the industries in which the Company operates and
proposes to operate as well as general economic conditions, prevailing exchange rates
and interest rates and conditions in the financial markets, among other things. Actual
events or results may differ materially from the events or results expressed or implied in
any forward-looking statement.
No forward-looking statement is a guarantee or representation as to future performance
or any other future matters, which will be influenced by a number of factors and subject
to various uncertainties and contingencies, many of which will be outside the Company’s
control.
ASX/AIM RELEASE | PAGE 7
The Company does not undertake any obligation to update publicly or release any revi-
sions to these forward-looking statements to reflect events or circumstances after to-
day's date or to reflect the occurrence of unanticipated events. No representation or
warranty, express or implied, is made as to the fairness, accuracy, completeness or cor-
rectness of the information, opinions or conclusions contained in this announcement.
To the maximum extent permitted by law, none of the Company’s Directors, employees,
advisors, or agents, nor any other person, accepts any liability for any loss arising from
the use of the information contained in this announcement. You are cautioned not to
place undue reliance on any forward-looking statement. The forward-looking state-
ments in this announcement reflect views held only as at the date of this announcement.
Celsius Resources Contact Information
Level 5, 191 St. Georges Terrace
Perth WA 6000
PO Box 7059
Cloisters Square PO
Perth WA 6850
P: +61 2 8072 1400
E: info@celsiusresources.com.au
W: www.celsiusresources.com
Celsius Resources Limited
Neil Grimes P: +61 419 922 478
E: info@celsiusresources.com.au
W: www.celsiusresources.com
Multiplier Media
(Australia Media Contact)
Jon Cuthbert
M: +61 402 075 707
E: jon.cuthbert@multiplier.com.au
Zeus Capital Limited
(Nominated Adviser & Broker)
Harry Ansell/James Joyce/
James Bavister
P: +44 (0) 20 3 829 5000
Zeus Capital Limited (“Zeus”) is the Company’s Nominated Adviser and is authorised and
regulated by FCA. Zeus’s responsibilities as the Company’s Nominated Adviser,
including a responsibility to advise and guide the Company on its responsibilities under
the AIM Rules for Companies and AIM Rules for Nominated Advisers, are owed solely to
the London Stock Exchange. Zeus is not acting for and will not be responsible to any
persons for providing protections afforded to customers of Zeus nor for advising them in
relation to the proposed arrangements described in this announcement or any matter
referred to in it.
ASX/AIM RELEASE | PAGE 8
Appendix 1: The following tables are provided to ensure compliance with the JORC Code (2012) re-
quirements for the reporting of Exploration Results for the MCB Project.
SECTION 1:
Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g.
cut channels, random chips, or spe-
cific specialised industry standard
measurement tools appropriate to
the minerals under investigation,
such as down whole gamma sondes,
or handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
• Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of min-
eralisation that are Material to the
Public Report. In cases where ‘indus-
try standard’ work has been done
this would be relatively simple (eg
‘reverse circulation drilling was used
to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g
charge for fire assay’). In other cases,
more explanation may be required,
such as where there is coarse gold
that has inherent sampling prob-
lems. Unusual commodities or min-
eralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
• Samples were collected from diamond
core drilled from the surface. All drill
core was generally sampled on 2-meter
intervals. In cases where geological and
mineralogical characteristics change,
sample length was not less than 1 meter.
• Core samples cut into half using dia-
mond core saw following the cutting
lines marked by the Geologist. Split
cores returned to its respective core tray.
• Samples were shipped by company vehi-
cle to Intertek Testing Services which is
an external laboratory located in Manila,
Philippines.
• Crushed samples were fire assayed for
gold (Au) using a 30-gram charge, with a
detection limit of 0.005 ppm. Gold val-
ues greater than 50 ppm were deter-
mined by gravimetric fire assay.
• Copper (Cu) values were assayed using
Four acid digestion. Elements deter-
mined by AAS finish with final reporting
for a total of 36 elements.
Drilling
techniques
• Drill type (e.g. core, reverse circula-
tion, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or
standard tube, depth of diamond
tails, face-sampling bit or other type,
whether core is oriented and if so, by
what method, etc).
• Diamond drilling was used to capture the
rock samples for the new drill hole inter-
cepts, with the following drill core size
summarized as follows:
• PQ sized drill core with a core diameter
of 81.1 mm was used from surface to
more competent lithology. Core samples
of this size are estimated to comprise
about 43%of the total length of the re-
cently drilled holes.
• HQ sized drill core, with a core diameter
of 61.1mm, was then substituted at
ASX/AIM RELEASE | PAGE 9
Criteria JORC Code explanation Commentary
greater depths to accommodate varia-
tions of subsurface conditions. Core
samples of this size is estimated to com-
prise about 57% of the total length of the
recently drilled holes.
Criteria JORC Code explanation Commentary
Drill sam-
ple recov-
ery
• Method of recording and as-
sessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
• Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to pref-
erential loss/gain of fine/coarse
material.
• Core recovery has been recorded for every in-
terval as part of the routine geomechanical log-
ging.
• Recovered core lengths on average were
measured to be over 98% for the total length
of the drill hole, indicating a high recovery and
minimal lost core.
• All drilling activities were supervised by com-
pany Geologists. Trained Core house Techni-
cian were responsible for the core recovery de-
termination.
• Core was arranged to fit the breakages before
the actual core length from the start to the end
of the drill run was measured. Percent recovery
was calculated from dividing the measured
core length over the total drill run multiplied by
100.
Logging • Whether core and chip samples
have been geologically and ge-
otechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
• Whether logging is qualitative
or quantitative in nature. Core
(or costean, channel, etc) pho-
tography.
• The total length and percentage
of the relevant intersections
logged.
• Geologists were tasked to oversee the daily
quick log report down to sampling. Daily quick
log form was completed to identify the geolog-
ical details such as lithology, alteration and
mineralisation with corresponding percentage
estimate of Cu minerals and Cu grade, using
an established geological code.
• Detailed logging proceeds describing geologi-
cal characteristics present in the core, i.e. lithol-
ogy, alteration, mineralogy, structures, etc.
• Core photography was undertaken after com-
pleting the geomechanical logging.
Sub-sam-
pling tech-
niques and
sample
prepara-
tion
• If core, whether cut or sawn and
whether quarter, half or all core
taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
• Samples were routinely taken over a 2m inter-
val, and cut in half, with half of the drill core
sent for analysis and half of the drill core re-
tained for future reference.
• Samples were cut on site using a hand core
saw. Samples were then selected and bagged
ASX/AIM RELEASE | PAGE 10
Criteria JORC Code explanation Commentary
• For all sample types, the nature,
quality and appropriateness of
the sample preparation tech-
nique.
• Quality control procedures
adopted for all sub-sampling
stages to maximise representiv-
ity of samples.
• Measures taken to ensure that
the sampling is representative of
the in-situ material collected, in-
cluding for instance results for
field duplicate/second-half sam-
pling.
• Whether sample sizes are ap-
propriate to the grain size of the
material being sampled.
on site prior to delivery to the laboratory (Inter-
tek) in Manila for sample preparation.
• The sample size is considered appropriate for
type of material being samples.
Quality of
assay data
and labora-
tory tests
• The nature, quality and appro-
priateness of the assaying and
laboratory procedures used and
whether the technique is consid-
ered partial or total.
• For geophysical tools, spec-
trometers, handheld XRF instru-
ments, etc, the parameters used
in determining the analysis in-
cluding instrument make and
model, reading times, calibra-
tions factors applied and their
derivation, etc.
• Nature of quality control proce-
dures adopted (e.g. standards,
blanks, duplicates, external la-
boratory checks) and whether
acceptable levels of accuracy
(i.e. lack of bias) and precision
have been established.
• Samples were fire assayed for gold (Au) using a
30-gram charge, with a detection limit of 0.005
ppm. Gold values greater than 50 ppm were
determined by gravimetric fire assay. Copper
(Cu) values were assayed using four acid diges-
tion. Elements determined by AAS finish
• The procedures for the submission of samples
to the laboratory also include the regular inser-
tion of QA/QC samples in every transmittal
form or batch, which was typically delivered to
the laboratory in batches of 50 numbered sam-
ples. For each batch of 50 samples a total of 43
came from core samples and an additional 7
samples were included for QA/QC checks,
which were as follows:
• Four referenced standards
• One referenced Blank
• One coarse (unrecognisable) blank
• One field duplicate taken from the quartered
core
• After sample preparation, all samples were
sent for final analysis to Intertek at their labora-
tory in Manila. Intertek is an internationally rec-
ognised and ISO/IEC 17025:2005 & ISO/IEC
17020:2004 certified independent laboratory.
Verification
of sam-
pling and
assaying
• The verification of significant in-
tersections by either independ-
ent or alternative company per-
sonnel.
• The use of twinned holes.
• Analytical procedures provided by an interna-
tionally certified laboratory is considered in line
with industry standard for the type of deposit
and mineralisation identified at the Property.
• Apart from the verification of the procedures
and results as described above, no further
ASX/AIM RELEASE | PAGE 11
Criteria JORC Code explanation Commentary
• Documentation of primary data,
data entry procedures, data ver-
ification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay
data.
verification of the sampling and assaying have
been undertaken.
• None of the diamond drill holes in this report
are twinned.
Location of
data points
• Accuracy and quality of surveys
used to locate drill holes (collar
and down-hole surveys),
trenches, mine workings and
other locations used in Mineral
Resource estimation.
• Specification of the grid system
used.
• Quality and adequacy of topo-
graphic control.
• All data reference points and maps for the
Makilala database, including drill hole collar
co-ordinates are recorded in WGS 84/UTM
Zone 51N.
• Compass measurements taken by Geologists
were used to establish the dip and azimuth of
the collar hole as part of their initial collar sur-
veys. Drill collar locations were positioned us-
ing a handheld Garmin GPS unit, set to UTM
WGS 84 Zone 51N coordinate reference sys-
tem, with an accuracy expected to be within 2
metres. Downhole surveys were also com-
pleted using a Keeper Gyro at 50m intervals.
• Collar surveys were then logged into the mas-
ter MS Excel spreadsheet as part of the data-
base.
Data spac-
ing and
distribu-
tion
• Data spacing for reporting of Ex-
ploration Results.
• Whether the data spacing and
distribution is sufficient to estab-
lish the degree of geological
and grade continuity appropri-
ate for the Mineral Resource and
Ore Reserve estimation proce-
dure(s) and classifications ap-
plied.
• Whether sample compositing
has been applied.
• The broad drilling pattern is at 100m spacing
for a series of diamond drill holes which are
oriented in a north-west direction and dipping
at predominantly at 60 degrees. These drill
holes are augmented by some drill holes which
have a west-north-west orientation or a north-
east orientation or are vertical. (see figure 1 for
Drill Hole Locations).
• Drill holes at the MCB deposit are distributed
broadly on eight grid lines, giving coverage of
1,000 metres from east to west.
• The drill hole spacing where significant cop-
per-gold mineralisation has been identified is
sufficient to determine the geology and grade
continuity of the area, as well as the ore body
and mineralisation extents.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sam-
pling achieves unbiased sam-
pling of possible structures and
the extent to which this is
known, considering the deposit
type.
• If the relationship between the
drilling orientation and the ori-
entation of key mineralised
structures is considered to have
introduced a sampling bias, this
• In the resource estimation, drill hole assays were
composited to 2 metres downhole intervals.
The dominant trend of the tonalite intrusion,
which is directly related to the broader lower
grade copper-gold mineralisation has an over-
all strike of 50 degrees and a sub-vertical dip.
Drill hole MCB-UG-001 was drilled at a 60-de-
gree angle to intersect the interpreted high-
grade positions.
ASX/AIM RELEASE | PAGE 12
Criteria JORC Code explanation Commentary
should be assessed and re-
ported if material.
Sample se-
curity
• The measures taken to ensure
sample security.
• The following standard procedures were en-
forced for the drilling of new intercepts:
Sample bags are arranged in sequence ac-
cording to its sample number. These are then
weighed and jotted down to a sample dispatch
note which details the sample numbers, sam-
ple type and laboratory processing required.
Geologists ensures that the transmittal form is
correct for encoding and submission. The bags
of samples are sent directly to the Intertek La-
boratory in Manila by company vehicle. No un-
supervised third parties were given access
prior to the chain of custody procedure.
• Samples were delivered to Intertek Testing Ser-
vices along with two copies of the sample dis-
patch form. One copy for the laboratory to ac-
cept custody of the sample, and the signed/re-
ceived copy return to database custodian at the
Core House facility in Tabuk, Kalinga.
Audits or
reviews
• The results of any audits or re-
views of sampling techniques
and data.
• No other specific audit or review was con-
ducted other than the validation checks by the
author documented earlier with regard to the
sample preparation, analysis or security for the
information in the new drillholes.
ASX/AIM RELEASE | PAGE 13
SECTION 2:
Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement
and land
tenure
status
• Type, reference
name/number, location
and ownership including
agreements or material is-
sues with third parties such
as joint ventures, partner-
ships, overriding royalties,
native title interests, histor-
ical sites, wilderness or na-
tional park and environ-
mental settings.
• The security of the tenure
held at the time of report-
ing along with any known
impediments to obtaining
a licence to operate in the
area.
• The Maalinao-Caigutan-Biyog (MCB) Copper-Gold
project is situated in Luzon Central Cordillera in the
Barangay of Balatoc, Municipality of Pasil, Province of
Kalinga.
• The property comprises a single Exploration Tene-
ment (EP-003-2006-CAR) which covers an area of ap-
proximately 2,500.82 hectares. The Exploration Tene-
ment surrounds the previous Copper-Gold mining
operations known as Batong Buhay Gold Mines, Inc.
• The underlying title is in the name of the Philippines
registered corporation Makilala Mining Company Inc.
(MMCI) which is 100% owned by Makilala Holdings
Ltd.
• Celsius Resources Ltd has acquired 100% of Makilala
Holdings upon the issuance of the extension to carry
out exploration of the Tenement (EP-003-2006-CAR)
from the Mines and Geosciences Bureau (MGB) of the
Philippines and this requirement was met on 24th
No-
vember 2020
Explora-
tion done
by other
parties
• Acknowledgment and ap-
praisal of exploration by
other parties.
• Exploration work and drilling was completed by
Makilala Mining Company Inc. which was previously
a subsidiary of Freeport-McMoran Exploration Cor-
poration-Philippine Branch from year 2006 to 2013,
the details of which have been documented in CLA
announcement dated 16 September 2020.
• The relative quality and detail associated with the
drilling information is considered to be of a high
standard. This has enabled the author to establish a
high level of confidence associated with the historical
drilling information.
Geology • Deposit type, geological
setting and style of miner-
alisation.
• The geological setting for the MCB copper-gold min-
eralisation is typical of a porphyry copper + gold +
moly deposit as commonly defined in many academic
papers (Hedenquist and Lowernstern, 1994; Sillitoe,
R. H., 2010. Corbett and Leach, 1997). The minerali-
sation and associated alteration exist across the con-
tact between the genetically related intrusive body
(tonalite) and the surrounding host rock material. In
most cases the surrounding host rock is a mafic vol-
canic, however, in some instances the older (not ge-
netically related to copper-gold mineralisation) intru-
sive bodies also exist in contact with the younger
ASX/AIM RELEASE | PAGE 14
Criteria JORC Code explanation Commentary
intrusive resulting in broad sections of mineralisation
and alteration within a series of intrusive bodies.
There is also evidence at MCB for epithermal vein de-
posit types which exist within close proximity to the
large-scale porphyry copper-gold mineralisation. At
this stage, only the deposit type that is identified from
the drilling information for MCB is a porphyry copper-
gold style.
• Basalt lava flows make up the majority of the host
rocks in the tenement area, which is part of the oldest
exposed unit, Basement Complex. This Cretaceous-
Paleogene Metavolcanics has been intruded by
quartz diorite complex, which in Kalinga, ranges in
composition from gabbro to tonalite.
• A later stage Tonalite intrusion exists throughout the
project area and is interpreted to be genetically re-
lated to the copper-gold mineralisation at MCB de-
posit.
• A dacite flow and dacitic pyroclastic blankets the
older basalt host rock and tonalitic intrusive rocks.
• There are four types of ore mineralisation that were
emphasized in the project:
o Type 1 - Early high-grade porphyry Cu-Au miner-
alisation, hosted both in tonalite and basalt.
o Type 2 - Mix of high-grade porphyry Cu-Au (Type
1) and high-sulphidation mineralisation (Type 4).
Hosted in basalt and tonalites, but with strong
Type 1 mineralisation that was partially over-
printed by ore Type 4.
o Type 3 - Medium grade porphyry-copper
o Type 4 - High-sulphidation epithermal minerali-
sation
• (See figures 2 and 3 for a representative Cross Sec-
tion of the Geology and its relationship to the copper-
gold mineralisation at the MCB Deposit).
Drill hole
Infor-
mation
• A summary of all infor-
mation material to the un-
derstanding of the explo-
ration results including a
tabulation of the following
information for all Material
drill holes:
• easting and northing of the
drill hole collar
• elevation or RL (Reduced
Level – elevation above sea
level in metres) of the drill
hole collar
• See Table 1 for all details pertaining to drill hole
MCB-UG-001 which is the subject of this release.
• In summary, with the inclusion of the drill hole re-
ported in this announcement, the drill hole data-
base for the Property consists of 59 diamond core
drilled holes with an accumulative meterage of
31,058.00.
ASX/AIM RELEASE | PAGE 15
Criteria JORC Code explanation Commentary
• dip and azimuth of the
hole
• down hole length and in-
terception depth
• hole length.
• If the exclusion of this in-
formation is justified on
the basis that the infor-
mation is not Material and
this exclusion
Share your feedback
Discover