Investor Presentation - June 2023
Released
Released
Announcement PDF
Developing a world class,
sustainable copper and
cobalt supply
Non-Deal Roadshow
Investor Presentation
June 2023
DISCLAIMER & NOTES
This presentation has been prepared by Celsius Resources Limited ("Celsius" or "CLA"). The information contained in this presentation is a
professional opinion only and is given in good faith.
The information contained herein is confidential and proprietary to the Company and is provided to recipients on the terms and conditions set out in
this disclaimer. The document, in whole or in part, is not to be distributed, copied or reproduced, in any form, without the prior written consent of the
Directors of the Company.
Certain information in this presentation has been derived from third parties and though CLA has no reason to believe that it is not accurate, reliable,
or complete, it has not been independently audited or verified by CLA.
Any forward-looking statements included in this presentation involve subjective judgement and analysis and are subject to uncertainties, risks and
contingencies, many of which are outside the control of, and maybe unknown to, CLA. In particular, they speak only to the date of this presentation,
they assume the success of CLA's strategies, and they are subject to significant regulatory, business, competitive and economic uncertainties and
risks. Actual future events may vary materially from the forward-looking statements and the assumptions on which these assumptions are based.
Recipients of this presentation are cautioned not to place undue reliance on such forward-looking statements.
CLA makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take
responsibility for updating any information or correcting any errors or omissions which may become apparent after this presentation is released.
To the extent permitted by law, CLA and its officers, employees, related bodies corporate and agents disclaim all liability, direct, indirect or
consequential (and whether or not arising out of the negligence ,default or lack of care of CLA and/or any of its agents) for any loss or damage
suffered by a recipient or other persons arising out of , or in connection with, any use or reliance on this presentation or information.
All amounts in AUD unless stated otherwise.
2
DISCLAIMER & NOTES
The information in this presentation with respect to the Mineral Resource Estimate for the MCB Project was first announced by Celsius to
ASX on 12 December 2022. Celsius confirms that it is not aware of any new information or data that materially affects the information
included in the announcement dated 12 December 2022 and that all material assumptions and technical parameters underpinning the
Mineral Resource Estimate continue to apply and have not materially changed.
The information in this announcement with respect to the outcomes of the Scoping Study for the MCB Project was first released by Celsius
to ASX on 1 December 2021. Celsius confirms that all material assumptions underpinning the production target and forecast financial
information derived from the production target referred to in the announcement of 1 December 2021 continue to apply and have not
materially changed.
The information in this presentation with respect to the Mineral Resource Estimate for the Sagay Project was first announced by Celsius to
ASX on 7 November 2022. Celsius confirms that it is not aware of any new information or data that materially affects the information included
in the announcement dated 7 November 2022 and that all material assumptions and technical parameters underpinning the Mineral
Resource Estimate continue to apply and have not materially changed.
The information is this presentation with respect to the Mineral Resource Estimate for the Opuwo Project was first announced by Celsius to
ASX on 1 July 2021. Celsius confirms that it is not aware of any new information or data that materially affects the information included in the
announcement dated 1 July 2021 and that all material assumptions and technical parameters underpinning the Mineral Resource Estimate
continue to apply and have not materially changed.
3
CELSIUS RESOURCES | Investment Case
❑ A mining exploration and development copper and gold
mining company with a portfolio of world-class copper-gold
assets.
Flagship Asset | Maalinao-Caigutan Biyog (MCB)
• Initial CAPEX US$253m
• Payback period 2.67 years
• Potential for 25-year mine life
•
MCB Copper-Gold project in Northern Luzon, Philippines.
• Pre-tax NPV(8%) US$618m (~A$865m) at an IRR of 35%
•
Sagay Copper-Gold project in Northern Negros, Philippines
• ECC granted
•
Opuwo Cobalt-Copper project in Namibia
❑ Strategically positioned to capitalise on a battery metals
commodity supercycle.
❑ Highly experienced Board and Management team with a
clearly defined strategy backed to deliver growth for
shareholders in accordance with global ESG principles.
Refer to the ASX announcement dated 1 December 2021 on the Positive Scoping Study Results
4
CELSIUS RESOURCES
Environmental, Social and Governance
Our Vision
To become an environmentally sustainable producer
of copper and gold via a number of operating mines
in the Philippines, generating significant profits and
dividends for shareholders whilst enhancing the wellbeing of all local communities in which we operate.
Our Mission
To create material value for shareholders through the
efficient conversion of high-quality resources into
profitable producing mines, in an environment that
adheres to the strictest safety standards and
sustainable environmental, social and governance
principles.
5
Highly Experienced
Board & Management
ATTILENORE MANERO
JULITO SARMIENTO
Executive Chairman
An experienced Philippine lawyer with over 30
years specialising in mining, environment, social
license, indigenous peoples, renewable energy,
government relations and who has established
close relationships with civil society, Church and
local communities.
PETER HUME
Managing Director
Country Operations Director - Philippines
Over 40 years’ experience on major mining and
construction development projects on lead roles
throughout Australia, Philippines and internationally..
With demonstrated experience in general
management, project management, construction
management, dispute resolution, infrastructure, and
process design, concept planning to commissioning
and operations, as well as design management,
development, and implementation of quality, safety,
and maintenance management systems.
SIMON FARRELL
Non-Executive Director
Involved in the resources industry for over 40 years.
He commenced his career in 1976 at the Bougainville
Copper mine . Post BCL he completed his MBA at
Wharton and subsequently worked at a senior/Board
level in a wide range of commodities and
jurisdictions.
MICHAEL HULMES
Non-Executive Director
A mining engineer with over 35 years experience,
most of which was in underground copper and gold
mine development and operations.
PINE VAN WYK
Country Operations Director - Namibia
Metallurgical Engineer with extensive experience in
developing and operating mines in Namibia...
Non-Executive Sustainability Director
Corporate Affairs & Sustainability Director-Philippines
A development professional who specialises in social and
environmental impacts management, with more than 13 years of
substantial practical experience in managing a diverse team of
local and international experts whilst carrying out studies leading to
the development and implementation of social and environmental
plans and programs consistent with local statutes and
internationally accepted standards.
PAUL JAMES DUDLEY
Non-Executive Director
A Fellow of the Institute of Chartered Accountants of England and
Wales and a Member of the UK's Chartered Institute of Securities
and Investments. He founded Aer Ventures (formerly HD Capital) in
2011 where he is Managing Partner, advising and leading corporate
transactions on numerous public and private companies.
KELLIE DAVIS
Corporate Secretary
Over 20 years of experience in accounting and secretarial ASX
Compliance, predominantly in the exploration and resources
sector beginning her career in Audit with Ernst and Young.
6
MAALINAO-CAIGUTAN-BIYOG PROJECT
Municipality of Pasil, Province of Kalinga,
Philippines
Maalinao-Caigutan Biyog (MCB)
Copper-Gold Project - Flagship project
Key Features
320km north of Manila.
In line with gov’t regulations, MCB is held by its Philippine subsidiary,
Makilala Mining Company, Inc.
Exploration Tenement covers c.2,500 hectares.
First Exploration permit granted in 2006.
The current permit is extended by the National Government until
the issuance of the Mine Permit.
Geology and Mineralisation
55 diamond drill holes completed from 2006-2022 with a cumulative
drilling distance of 30,487.50m at a total cost of A$30.9M.
Resource drilling resulted in an updated JORC Mineral Resource
Statement.
This will feed into a revised mine plan and ore reserve which has
been included in the Company’s Feasibility Study to the Phil.
National Gov’t.
Refer to ASX Announcement dated 12 December 2022, AMC Consultants Pty Ltd Competent Person’s 2022 Report and CLA Reports
Figure 1. Project Location
8
MCB | Outstanding Assay Results
❑ The 2021 drilling program was designed to improve the
confidence of the existing Mineral Resource in addition
to focusing on defining further higher-grade positions.
❑ Copper mineralisation starts at the surface and is now
confirmed to depths of over 600m below surface.
❑ Assay results have all confirmed further extensions to
the shallow high-grade mineralisation at MCB.
❑ Favorable results from the drilling campaign enhances
confidence in the updated 2022 Mineral Resource.
❑ Drilling results will be utilized to improve the mine plan
and produce early cash flow through the extraction of
shallow mineralisation.
Information relating to Exploration Results and Mineral Resource Estimates is based on information compiled, reviewed, and
assessed by Steve Olsen who is a member of the Australasian Institute of Mining and Metallurgy and the Australian Institute
of Geoscientists.
Refer to ASX announcements on the drilling results dated 10 June 2021 (MCB-033), 28 July 2021 (MCB-034), 13 Dec 2021 (MCB036), 23 May 2022 (MCB-037), 04 July 2022 (MCB-038), 03 August 2022 (MCB-039), 19 October 2022 (MCB-040 & MCB-041),
and 28 February 2023 (MCB-042 to MCB-044).
Hole ID
MCB-033
MCB-034
MCB-036
MCB-037
MCB-038
MCB-039
MCB-040
MCB-041
MCB-042
MCB-043
MCB-044
Total Depth
730.60
incl.
incl.
incl.
607.00
incl.
incl.
860.20
incl.
incl.
548.20
incl.
incl.
incl.
643.90
incl.
incl.
incl.
incl.
409.30
incl.
incl.
433.80
incl.
incl.
incl.
131.00
incl.
200.30
incl.
155.70
142.10
Depth
From
17.00
229.75
305.00
340.00
20.00
28.00
349.00
19.00
26.50
89.00
19.50
19.50
93.00
359.90
32.50
207.15
391.55
232.10
574.46
18.00
18.00
349.10
30.00
42.50
114.00
170.00
339.00
19.50
66.00
7.7
7.7
9.0
11.0
Depth
To
636.00
604.00
392.85
391.91
627.00
94.00
425.00
691.00
150.00
102.00
548.20
35.00
134.90
510.00
643.90
358.00
626.00
309.65
623.84
111.00
65.00
356.60
191.00
62.00
124.00
192.00
351.00
30.00
131.00
200.3
59
110.5
142.1
Length
(m)
619.00
374.25
87.85
51.90
607.00
66.00
76.00
672.00
123.50
13.00
528.70
15.50
41.90
150.10
611.40
150.85
234.45
77.55
49.38
93.00
47.00
7.40
162.00
19.50
10.00
22.00
12.00
10.50
65.00
192.6
51.3
101.5
131.1
Cu
(%)
0.41
0.51
1.24
1.58
0.44
0.53
0.93
0.43
0.92
3.69
0.55
1.02
0.87
0.86
1.39
1.90
1.90
2.47
2.46
0.59
0.79
0.65
0.58
0.95
1.17
0.77
1.22
0.69
1.73
0.56
0.93
0.90
0.93
Au
(g/t)
0.08
0.11
0.36
0.53
0.06
0.03
0.14
0.12
0.24
0.39
0.19
0.07
0.05
0.47
0.75
1.57
0.87
2.12
1.33
0.05
0.07
0.41
0.02
0.05
0.04
0.02
0.06
0.07
0.37
0.04
0.06
0.18
0.23
9
MCB | Mineral Resource Estimate
❑ An updated JORC Mineral Resource Estimate was
announced in December 2022, comprising:
Type
Weathered
Fresh
Combined
Classification
Measured
Indicated
Inferred
Total
Measured
Indicated
Inferred
Total
Measured
Indicated
Inferred
Total
Tonnes
(Mt)
2
7
0
9
45
242
42
328
47
249
42
338
Copper
Grade
(%)
0.59
0.56
0.38
0.57
0.59
0.43
0.52
0.46
0.59
0.44
0.52
0.47
Gold
Grade
Copper
Metal
Gold
Metal
(g/t)
0.07
0.09
0.12
0.09
0.19
0.11
0.11
0.12
0.19
0.11
0.11
0.12
(kt)
(kozs)
11
41
0
53
263
1044
218
1525
275
1085
219
1578
4
22
0
26
277
883
153
1313
282
904
154
1340
Note: Estimates have been rounded to the nearest MT of ore, two significant figures for Cu and Au grade, and to
the nearest kt of Cu metal and kozs of Au metal. Some errors may occur due to rounding.
❑ Global Mineral Resource of 338Mt @0.47% copper and
0.12g/t gold (0.2% Cu cut-off).
❑ Total Resource includes approximately 1.6Mt of contained
copper and approx. 1.3Moz of gold.
Section 1 with the interpreted host rock geology relative to the defined copper
mineralised domains.
Refer to the ASX announcement dated 12 December 2022 for the Updated JORC Mineral Resource Statement prepared by Steve Olsen (MAusIMM, AIG)
10
MCB | Project Design
Estimated initial capital investment is US$253M which excludes initial operating
capital.
Designed to be developed and operated through a sublevel open stoping mining
method with backfilling and dry stacking method to enable a primary-secondary
extraction sequence.
This allows for higher resource recovery and mining productivity, reducing
tailings deposit requirements, and maximising strength relative to cement
content.
This will remove the possibility of environmental impacts of a conventional
tailings dam.
Excess filtered tailings will be utilised as backfilling for flood control measures,
community livelihood projects, and road construction.
Planned ore production rate is at 2.28Mtpa or ~49Mt of material over a mine
life of 25 years, with an ability to increase capacity to 4.5mtpa following initial
development.
MCB Underground Mine Layout
Process plant design is based on a single processing train configuration with a
maximum capacity ore feed rate of 2.4Mtpa (nominal 2.28Mtpa) to produce
bulk copper-gold concentrate.
Refer to the ASX announcement dated 01 December 2021 for Positive Scoping Study Results and Slide 9 for the technical and financial consultants.
11
MCB | Positive Study Results
Key Inputs
Optimised mine plan
focused on the high-grade
Cu-Au portion of the MRE,
equating to 49mt at 0.85%
Cu and 0.41 g/t Au, 100%
of which was classified as
Indicated resources.
Underground sub-level
open stoping mining
method.
Marketing study indicates
high marketability for MCB
clean copper concentrate.
Base case
Payback
period
Pre-tax NPV(8%)
US$618m (~A$865m) at an
IRR of 35% assuming
US$4/lb Cu & US$1,695/oz
Au
Potential for 25-year
mine life
Post-tax NPV(8%)
US$464m (~A$650m) at an
IRR of 31% assuming
US$4/lb Cu
& US$1,695/oz Au
Years 1 to 10
production
Initial CAPEX
US$253m
LOM C1 cash cost
US$1.29/lb Cu,
net of Au credits
2.67 years
Metallurgical
test work recoveries
90ktpa
of concentrate
containing 22ktpa
Cu and 27k oz/pa Au
Quoted resources utilising a
0.5% Cu lower
cut-off grade
Refer to ASX Announcement on the Scoping Study Results dated 01 December 2021, 12 December 2022, and Slide 9 for technical and financial consultants
94% Cu
and
79% Au
Years 1-10
C1 cash
cost average
US$0.73/
lb Cu
12
MCB | Government Approvals and Permitting
Key Technical Requirements
Submission
& Approvals
Declaration of Mining Project Feasibility Approval
▪
Environmental Compliance Certificate
o Environmental Impact Statement
▪
Mining Project Feasibility Study
▪
Care and Maintenance Program
▪
Environmental Protection and Enhancement Program
▪
Final Mine Rehabilitation and Decommissioning Plan
▪
Social Development and Management Program
Mineral Production Sharing Agreement Approval
▪
MPSA Application
▪
Three-Year Development/Work Utilisation Program
▪
Free Prior and Informed Consent Memorandum of
Agreement
Refer to ASX Announcement dated 15 November 2022 and 31 May 2023
☑
☑
This project has significant
potential; we will endorse it as
a priority project to fast-track
government approvals.
☑
☑
☑
☑
☑
☑
☑
MMCI Team with MGB Regional Director
and Mining Tenements Chief
☑
13
MCB | Agreement with Local Partner
❑ Celsius signed a Binding Deed and Agreement
on 17 March 2023 with Sodor, Inc. and the
PMR Group for the development of the MCB
Project.
❑ Our local partners share the same commitment to
developing the mine project in a sustainable and
transformative manner.
❑ This partnership undertaking satisfies the
requirement for securing a Mineral Production
Sharing Agreement (MPSA) with the Philippine
Government.
❑ The agreement involves a funding commitment
of US$43m to apply towards financing the MCB
Project construction.
❑ This agreement ensures MMCI’s full
compliance with the 60-40 nationality
requirement under MPSA guidelines; with
the view that Sodor Inc. and the PMR Group
will have a 30% economic share in the mining
and milling operations.
Refer to the ASX announcement dated 14 December 2022 and 20 March 2023.
Ceremonial signing of Initial Binding Deed and Agreement
14
MCB | Proposed Timeline
2006-2016
2021
2022
EXPLORATION
Selecting exploration targets, mapping,
Geochem, surface sampling, drilling
PRELIMINARY TECHNICAL STUDY
MINE FEASIBILITY STUDY
Diamond drilling, technical studies, metallurgical sampling
FPIC
ECC
EPEP/FMRDP
LGU Endorsement
SDMP
3YWD/UP
DMPF APPROVAL
2023
MINERAL PRODUCTION SHARING
AGREEMENT
PRE-DEVELOPMENT PERMITTING
WATER PERMIT
TREE CUTTING PERMIT
CONSTRUCTION PERMITS
EARLY WORKS
2024
START OF CONSTRUCTION
2025
START OF COMMERCIAL PRODUCTION
Note: Timelines are indicative and subject to change depending on government approval process
15
BOTILAO PORPHYRY COPPER-GOLD PROSPECT
Municipality of Pasil, Province of Kalinga
PHILIPPINES
Botilao Porphyry Copper-Gold Prospect
❑ Botilao tenement is located in the Cordillera Administrative
Region in the Philippines, ~320km north of Manila.
❑ It is a prospect within the Makilala portfolio with an
approximate area of 947 hectares, southwest of the MCB
Project.
❑ Exploration permit pending approval.
❑ The initial two-year exploration program aims to define the
extent and distribution of the observed mineralisation along
Botilao Creek.
❑ Exploration activities will consist of regional to semi-detailed
geochemical sampling and mapping to generate future
targets for possible geophysical surveys and eventual
diamond drilling activities.
Refer to ASX announcement dated 20 June 2023
17
Botilao Porphyry Copper-Gold Prospect
❑ Drilling was previously conducted by Lepanto
Exploration Asia in the '70s which determined
the presence of copper-gold mineralisation in
the area.
❑ Botilao is along the same northeast structure
which is a major control of the porphyry Cu-Au
mineralisation in the MCB Project that will
provide the initial working model for the Botilao
Prospect.
❑ Mapping of different rock types or lithologies in
the area will be conducted to characterise and
delineate mineralised or altered zones.
❑ Detailed mapping will focus on identified
mineralised outcrops to ensure proper
understanding of the classification and controls
of mineralisation during exploration phase.
Refer to ASX announcement dated 20 June 2023
18
SAGAY COPPER-GOLD PROJECT
Province of Negros Occidental,
Philippines
Sagay Copper-Gold Project
Sagay Copper-Gold Project is held by Tambuli Mining
Company, Inc., a Philippine subsidiary of Celsius Resources,
Ltd. with a tenement area of 4,584 hectares.
Exploration commenced in 2008, including:
geological mapping
gridlines preparations
soil and rock sampling
geophysical surveys consisting of induced
polarisation, resistivity, and ground magnetics.
35 drill holes completed from 2012 to 2022 with a cumulative
drilling distance of 27,427.30m. Total cost of ~AUD$11.1M.
Sagay Project hosts a large-scale porphyry copper-gold
mineralisation.
Refer to ASX announcement dated 23 June 2022 and 7 November 2022
20
Sagay | Maiden Mineral Resource Estimate
❑ A maiden JORC-compliant Indicated and Inferred Mineral Resource of 302 million tonnes @ 0.41%
copper and 0.11g/t gold.
❑ MRE defined by 32 diamond drill holes in Nabiga-a Hill which are broadly spaced and have shown
copper mineralisation over an extended area from the surface down to 1.2 km in depth.
❑ Copper mineralisation is open in all directions in addition to further drill intersections which are not
yet included in the MRE due to limited drilling information.
❑ There is potential for internal higher-grade sections which is indicated in drill holes completed to
date.
Table 1. Nabiga-a Mineral Resource
Domain
Total
Total
Tonnes
(Mt)
Copper
Grade (%)
Gold Grade
(g/t)
Copper
Metal (kt)
Gold Metal
(koz)
Indicated
15
0.45
0.11
68
53
Inferred
287
0.41
0.11
1,175
993
302
0.41
0.11
1,244
1,046
Classification
Information relating to Exploration Results and Mineral Resource Estimates for the Sagay Project is based on information compiled, reviewed and assessed by Steve Olsen, a member
of the Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists.
Refer to ASX Announcement dated 18 February, 11 July, and 7 November 2022 and AMC Consultants Pty Ltd Competent Person’s 2022 Report
21
Sagay | Development Approach
The definition of large-scale copper mineralisation will enable CLA
to consider lower cost bulk mining methods as part of the next
phase of studies.
Sagay project can be developed in a Phased Approach:
Phase 1: Developing the shallow chalcocite zone
(900SG) with a low CAPEX model, small-scale operation.
Phase 2: Developing the large-scale copper mineralisation at
deeper levels using the cashflow from Phase 1.
The preliminary metallurgical test work commenced in June
2023 using the fresh samples collected from the chalcocite zone.
The test work aims to determine whether the copper
mineralisation at a 900SG is amenable to VAT leaching.
Positive metallurgy test work results will trigger additional shallow
resource drilling to support the mining study, mineral resource
conversion to reserve, and metallurgical test work optimisation.
Preparations of key technical, environmental, and social studies are
underway leading to a Declaration of Mining Project Feasibility,
which will trigger the application and approval of a mining permit in
2024.
22
OPUWO COBALT-COPPER
PROJECT
Northern Namibia, Southern Africa
Opuwo Cobalt-Copper Project
❑ Celsius’ subsidiary held under Opuwo Cobalt Holdings (Pty)
Ltd. Celsius has 95% ownership of the Opuwo Project while
the remaining 5% is owned by a local company, Namibian
Former Robin Island Political Prisoners Trust, in line with
Namibian gov’t regulations.
❑ Located 730km north-west of the capital, Windhoek. A
mining-friendly, politically stable, and safe location with
excellent infrastructure and ample access to grid power,
water, and services.
❑ Exclusive Prospecting Licences covering c.719 km2.
❑ Well-positioned to take advantage of increasing cobalt
demand, a key element in the production of lithium-ion
batteries used in electric vehicles and home battery storage.
Refer to ASX Announcement dated 7 February 2022, and AMC Consultants Pty Ltd Competent Person’s 2022 Report
24
Opuwo | Key Features
❑ The Opuwo deposit is a mineralised
body with a minimum strike length of
25 km, out of which only 13 km has
been drilled.
EPL4540
Co-Cu-Zn (DOF)
❑ +95% of the Mineral Resource is
comprised of fresh sulphide ore with
over 80% in an Indicated category
based on the JORC resource
estimate.
EPL4346
❑ Mineralised zones are open in all
directions with excellent scope for
expansion with further drilling.
Information relating to Exploration Results and Mineral Resource Estimates is based on the information, compiled, reviewed and assessed by Dr. Rainer Ellmies for
the Opuwo Project who is a Member of the Australasian Institute of Mining and Metallurgy.
Refer to ASX Announcement dated 16 April 2018, 17 August 2022, and AMC Consultants Pty Ltd Competent Person’s 2022 Report
25
Opuwo | Mineral Resource Estimate
Upgraded JORC Compliant
Resource estimate comprising
225.5 Mt at 0.12% Co, 0.43% Cu
and 0.54% Zn.
The Minerals Resource estimate
represents contained 259,000
tonnes of contained Co, and
970,000 tonnes of contained Cu,
and consists of:
Opuwo Mineral Resource Estimate, by classification, 1 July 2021
Category
Indicated
Cut-off
(Co eq%)
Tonnage
(MT)
Cobalt
(%)
Copper
(%)
Zinc
(%)
Combined
Cobalt (kt)
Open Pit
0.06
38
0.11
0.45
0.51
41
Underground
0.155
7
0.11
0.41
0.49
8
45
0.11
0.44
0.51
48
Mining Method
Total Indicated
Inferred
Indicated: 45.3 Mt at 0.11%
Co, 0.44% Cu and 0.51% Zn.
Open Pit
0.06
29
0.09
0.38
0.44
27
Underground
0.155
151
0.12
0.44
0.57
183
180
0.12
0.43
0.55
211
225
0.12
0.43
0.54
259
Total Inferred
Total
Inferred: 180.2 Mt at 0.12%
Co, 0.43% Cu and 0.55% Zn.
Information relating to Exploration Results and Mineral Resource Estimates for
the Opuwo Project is based on the information, compiled, reviewed and assessed
by Dr. Rainer Ellmies who is a Member of the Australasian Institute of Mining and
Metallurgy.
Refer to ASX Announcement dated 1 July 2021 and AMC Consultants Pty Ltd Competent Person’s 2022 Report
26
Opuwo | Updates
❑ 9 diamond drill holes with a total of 1,089m for future metallurgical
optimisation work which is underway.
❑ Drilling confirmed the trend along the strike-length of the modelled ore
body, reinforcing the consistent nature of the Opuwo Cobalt
Deposit mineralisation.
❑ Preliminary roasting and tank leach test work results (from bulk
samples) show encouraging results of 95% cobalt and 98% copper
recovery which demonstrates that the Opuwo Ore is amenable for
Roasting & Tank Leach downstream processing method.
❑ Ongoing metallurgical test work to further refine the cobalt and copper
recoveries is on going to feed into the engineering design criteria.
❑ Further mining optimisation work is currently underway to update the
2018 Scoping Study and reduce cost to support future Feasibility
Studies.
❑ The Company has lodged the necessary documentation to have the
permits renewed by the Ministry of Mines with a favorable response.
Refer to ASX Announcement dated 16 January 2018, 16 April 2018, 17 August 2022, 28 April 2023 and AMC Consultants Pty Ltd Competent Person’s 2022 Report
27
Opuwo | Development Approach
❑ Economic Scoping Study planned later in 2023.
❑ Assessing ways of improving project viability given recent
increases in the cobalt and copper prices.
❑ Further test works being undertaken to delineate the roasting and
tank leach parameters which may further improve cobalt recovery
and continuing test work for a hydrometallurgical downstream
processing method.
❑ Mining optimisation work is currently underway to update the 2018
Scoping Study to reduce cost to support future Feasibility Studies.
❑ Priority is to review the project and to understand how best to
unlock potential value.
28
Investment Summary
1
2
Generating and exploring
a Pipeline of near-term
producing copper-gold
and Cobalt projects
while prioritising the
development of the MCB
project.
Highly experienced Board
and Management team
with in-country project
development experience
and demonstrated capital
funding.
3
MCB Copper-Gold Project
4
Sagay Copper-Gold Project
Initial CAPEX US$253m
Payback period 2.67 years
Potential
for 25-year
mine life
MBC Flagship
Project
(8%)
US$618m
Pre-tax NPV
(~A$865m) at an IRR of 35%
ECC granted
Extensive funding interest
Preparations of key technical,
environmental, and social
studies underway
JORC-compliant Indicated and
Inferred Mineral Resource of 302
million tonnes @ 0.41% copper
and 0.11g/t gold.
Two stage development program
Refer to ASX Announcement dated 1 July 2021, 1 December 2021, and 7 November 2022
5
Opuwo Cobalt-Copper Project
Exclusive Prospecting Licences
Positioned to take advantage of
increasing cobalt demand.
Upgraded resource comprising
225.5 Mt at 0.12% Co, 0.43% Cu
and 0.54% Zn.*
covering c.719 km2.
29
Appendices
MCB | Mine Plan
MCB | Support Infrastructure
MCB | Strong Government and Social Acceptability
MCB | Copper | A globally significant battery metals
opportunity
30
MCB | Mine Plan
Note: A video on the 3D Representation of the MCB Deposit and Mine Plan can be viewed at the CLA website.
Prepared by Steve Olsen (MAusIMM, AIG), https://celsiusresources.com/celsius-releases-3d-model-of-mcb-resource/
31
MCB | Support Infrastructure
Access Road to port will require a new road
opening and a road upgrade to allow transport of
oversized cargo.
Concentrate production will be transported and
stored in a port laydown area using one of the
nearest port locations.
Power sourced from existing national grid supply
lines.
Alternative power sources may be accessible in the
future when various renewable energy
projects become operational.
Actual development footprint is 31.83 hectares
(1.17% of the total Tenement area).
Additional area allocated for environmental
protection and enhancement activities (i.e., flood
control, tree planting, etc.).
Refer to ASX Announcement on the Scoping Study Results dated 01 December 2021 and Slide 9 for technical and financial consultants
32
MCB | Strong Government and Social Acceptability
❑ Philippine Government to ramp up the mining industry as a key economic driver and source of longterm economic growth.
❑ Mines and Geosciences Bureau (MGB) awarded the MCB project priority status to fast-track project
approvals.
❑ Social Licenses to Operate obtained from the host community through a Free, Prior and Informed
Consent process as well as local government endorsements for the project.
MMCI President with the Balatoc Council