Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Quarterly Activities Report
For the quarter ended 31 December 2023
31 JANUARY 2024
SAGAY PROJECT APPLIES FOR DMPF
HIGHLIGHTS
• Sagay Project application for Declaration of Mining Project Feasibility
• A MOA with the Kalinga Provincial Government was signed to jointly develop the MCB
Project road access alignment from mine to port facility
• Closing cash as at 31 December 2023 of A$2.047 million
Celsius Resources Limited (“Celsius” or the “Company”) (ASX, AIM: CLA) is pleased to provide
the following summary of the Company’s activities for the quarter ended 31 December 2023.
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
PROJECTS
MAALINAO-CAIGUTAN-BIYOG COPPER-GOLD PROJECT (“MCB PROJECT”),
PHILIPPINES (40%)
Makilala Mining Company, Inc. (“MMCI”), a Philippine affiliate of Celsius in the Philippines, has
progressed its permitting requirements for its flagship Maalinao-Caigutan-Biyog Copper-Gold
Project (“MCB Project”) in the Cordillera Administrative Region.
All required technical, social, and environmental plans and programs have been approved
leading to the approval of the Declaration of Mining Project Feasibility (DMPF). The DMPF is
a critical step in securing a Mineral Agreement with the Philippine Government which is
anticipated early in 2024 1.
While waiting for the issuance of a mining permit, ground activities were kept to a minimum
while preparing for the pre-development phase. Included in the preparation is the signing of a
Memorandum of Agreement (“MOA”) with the Provincial Government Unit of Kalinga to jointly
develop the road alignment for the MCB Project’s access from mine site to port 2. The
Company has several investors ready to commit the required funding to develop the MCB
Project once the mining permit has been secured.
BOTILAO COPPER-GOLD PROSPECT (40%)
On 7 August 2023, MMCI was issued an exploration permit for its Botilao Copper-Gold
Prospect, 6km southwest of the MCB Project in the Cordillera Administrative Region.
Figure 1: Map of the Botilao Tenement with reference to the MCB Tenement in the Cordillera
Administrative Region
1 Refer to ASX announcement dated 28 September 2023 “MCB Project receives DMPF approval”
2 Refer to ASX announcement dated 19 October 2023 “Celsius Collaborate with Kalinga LGU for MCB Road Access”
2
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
The initial two-year exploration permit aims to define the extent and distribution of the
observed mineralisation along Botilao Creek, which will consist of regional to semi-detailed
geochemical sampling and mapping to generate future targets for possible geophysical
surveys and eventual diamond drilling activities 3.
The approved Exploration Work Program will be implemented alongside an Environmental
Work Program and a Community Development Program (CDP). The CDP will be developed in
consultation with the host community to ensure alignment with community and local
government plans and programs.
Following the issuance of the exploration permit, tabletop work was carried out to gather
and consolidate available data and reports as basis for planning field activities early in 2024.
OPUWO COBALT PROJECT, NAMIBIA (95%)
Celsius Resources’ Namibian subsidiary held under Opuwo Cobalt Holdings (Pty) Ltd. has
received renewal of the exclusive prospecting license for the Opuwo Cobalt Project (“Opuwo”),
730km north-west of the Namibian capital city, Windhoek.
The renewal of the exclusive prospecting license (EPL 4346), which covers approximately 683
km2, was issued by the Namibian Ministry of Mines and Energy on 11 October 2023 for a
period of two years. The renewed license will enable Celsius to further evaluate the project’s
viability and strategically unlock its potential value with a view to finding a suitable partner.
Ongoing trade-off studies on mining costs, production rates, and the possibility of processing
oxide ores are being conducted to determine project viability and financial outcomes 4.
SAGAY COPPER-GOLD PROJECT, PHILIPPINES (100%)
Tambuli Mining Company, Inc. (“TMCI”), a wholly owned Philippine subsidiary of Celsius in the
Philippines, completed exploration works with positive results for the Sagay Copper-Gold
Project (“Sagay Project”) in the Negros Islands.
Exploration activities for the period focused on the shallow high-grade copper, or the
Supergene (Secondary Sulfide) Enrichment Domain (900SG) zone based on the results of the
desktop studies, resource estimation, and the indicative results from the test pit samples sent
for geochemical and metallurgical analysis.
Twelve (12) shallow drill holes were completed with a total meterage of 824.70 drilled. Results
from the shallow drilling program identified significant copper mineralisation from 8 out of 12
drill holes completed.
Highlights from the drilling program include:
• 69.3m @ 0.56% copper from 10.7m down hole from SGY-040, including
o 23.3m @ 1.19% copper from 15m down hole.
• 47.0m @ 0.85% copper from 33m down hole from SGY-045, including
o 35m @ 1.01% copper from 35m down hole.
• 50.3m @ 0.68% copper from 31.7m down hole from SGY-049, including
o 30m @ 0.87% copper from 52m down hole. 5
3 Refer to ASX announcement dated 7 August 2023 “Philippine government issues exploration permit for Celsius’ Botilao Copper-
Gold Prospect”
4 Refer to ASX announcement dated 6 November 2023 “Celsius receives renewal of Exclusive Prospecting License for Opuwo
Project”
5 Refer to ASX announcement dated 17 October 2023 “Shallow Copper Results from Sagay”
3
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
Figure 2: Cross-section of recent drill holes SGY-040, SGY-043 and SGY-044 relative to the
interpreted geology and significant assay results.
The conclusion of the drilling program along with results of the desktop studies and
compilation of all exploration data were contained in the complete and Final Exploration
Report. This became the basis for the formulation of the Mining Project Feasibility Study which
was submitted to the Philippine Mines and Geosciences Bureau, along with other required
technical, social, and environmental plans and programs, for the application of Declaration of
Mining Project Feasibility for the Sagay Project, the approval of which will trigger the
application for a Mineral Agreement with the Philippine Government.
CULLARIN WEST PROJECT, NSW (100%)
The Company is continuing to assess the viability of the opportunity and gauge interest from
other possible partners. No development activities were conducted during the quarter.
CORPORATE AND EXPENDITURE
The Company held its Annual General Meeting on 14 November 2023, where all resolutions
put to members at the meeting passed 6.
Cash Position
At the end of the quarter, the Company held approximately A$2.047 million in cash reserves.
ASX ADDITIONAL INFORMATION
The Company provides the following information pursuant to ASX Listing Rule requirements:
6 Refer to ASX announcement dated 14 November 2023 “Results of Meeting”
4
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
•
ASX Listing Rule 5.3.1:
Approximately A$657k was spent on exploration expenditure primarily relating to the
development of the MCB and Sagay Projects.
•
ASX Listing Rule 5.3.2:
The Company confirms that there was no mine production and development activities
for the quarter.
•
ASX Listing Rule 5.3.5:
The Company advises that there were A$220k in payments made to related parties of
the Company and their associates during the quarter for Director fees and consultancy
fees.
Tenement Table: ASX Listing Rule 5.3.3 Mining tenement interests held at the end of the
quarter and their location
PERMIT
NAME
REGISTERED
HOLDER /
APPLICANT
PERMIT
STATUS
PERMIT
EXPIRY
INTEREST /
CONTRACTUAL
RIGHT
EL 8996
Cullarin Metals
Pty Ltd
Granted
17/08/2026
100%
EL 4346
Gecko Cobalt
Holdings
Granted
10/10/2025
95%
40%
PERMIT
NUMBER
Western Australia
Cullarin West
Namibia
Opuwo
Philippines
MaalinaoCaigutanBiyog 7
EP-003-2006CAR
Makilala Mining
Company Inc.
Granted
Colayo
EXPA-073-CAR
Makilala Mining
Company Inc.
Waiting for
the MPSA
Mining
permit to be
issued
Granted
29/09/2025
40%
Panaon
EXPA-000127VIII
PDEP, Inc.
Complying with
further
permitting
requirements
TBA
100%
Sagay
EP-000003-VI
Tambuli Mining
Company Inc.
Granted
10/02/2024
100%
The mining tenement interests acquired during the quarter and their location:
Nil.
Beneficial percentage interests held in farm-in or farm-out agreements at the end of the
quarter:
Not applicable.
Beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of
during the quarter:
Nil.
The Maalinao-Caigutan-Biyog (MCB) project has gained an automatic extension as all documentation has been submitted to
the Philippine National Government for the awarding of a MPSA Mining permit.
7
5
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
This announcement has been authorised by the Board of Directors of Celsius Resources Limited.
The information contained within this announcement is deemed by the Company to constitute
inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it
forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018.
For further information contact:
Celsius Resources Limited
Peter Hume
Multiplier Media
(Australian Media Contact)
Jon Cuthbert
Tavistock Communications
(UK Media and Investor Relations)
Charles Vivian
Tara Vivian-Neal
P: +61 8 9482 0500
E: info@celsiusresources.com.au
W: www.celsiusresources.com
M: +61 402 075 707
E: jon.cuthbert@multiplier.com.au
P: +44 (0) 207 628 3396
M: 0044 7977297903
E: charles.vivian@tavistock.co.uk
M: 0044 7394408654
E: tara.vivian-neal@tavistock.co.uk
Beaumont Cornish Limited
(Nominated Adviser)
Roland Cornish/Andrew Price
P: +44 (0) 207 628 3396
E: corpfin@b-cornish.co.uk
WH Ireland (Broker)
Harry Ansell/James Joyce/Isaac Hooper
P:+44 (0) 20 7220 1666
Competent Persons Statement
Information in this report relating to Exploration Results and Mineral Resources for the MCB
Project and the Sagay Project is based on information compiled, reviewed and assessed by
Mr. Steven Olsen, who is a Member of the Australasian Institute of Mining and Metallurgy and
the Australian Institute of Geoscientists. Mr. Olsen is a consultant to Celsius Resources
Limited and has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined by the 2012 Edition of the Australasian Code for reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr. Olsen consents to the inclusion
of the data in the form and context in which it appears.
The information in this Report that relates to the estimate of Mineral Resources for the Opuwo
Project is based upon, and fairly represents, information and supporting documentation
compiled by Mr Kerry Griffin, a Competent Person, who is a Member of the Australian Institute
of Geoscientists (AIG). Mr Griffin is a Principal Geology Consultant at Mining Plus Pty Ltd and
an independent consultant engaged by Celsius Resources Pty Ltd for this work and has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 edition of the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves” (the JORC Code). Mr Griffin consents to the inclusion
6
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
in this announcement of matters based on his information in the form and context in which it
appears.
The Company confirms that it is not aware of any new information or data that materially
affects the Mineral Resource for the MCB 8 Project, the Sagay 9 Project or the Opuwo 10 Project.
The Company also confirms that all material assumptions and parameters underpinning the
Mineral Resource estimate continue to apply and have not materially changed.
Forward Looking Statements
Some of the statements appearing in this announcement may be in the nature of forwardlooking statements. You should be aware that such statements are only predictions and are
subject to inherent risks and uncertainties. Those risks and uncertainties include factors and
risks specific to the industries in which the Company operates and proposes to operate as
well as general economic conditions, prevailing exchange rates and interest rates and
conditions in the financial markets, among other things. Actual events or results may differ
materially from the events or results expressed or implied in any forward-looking statement.
No forward-looking statement is a guarantee or representation as to future performance or
any other future matters, which will be influenced by a number of factors and subject to
various uncertainties and contingencies, many of which will be outside the Company’s control.
The Company does not undertake any obligation to update publicly or release any revisions to
these forward-looking statements to reflect events or circumstances after today's date or to
reflect the occurrence of unanticipated events. No representation or warranty, express or
implied, is made as to the fairness, accuracy, completeness or correctness of the information,
opinions or conclusions contained in this announcement. To the maximum extent permitted
by law, none of the Company’s Directors, employees, advisors, or agents, nor any other person,
accepts any liability for any loss arising from the use of the information contained in this
announcement. You are cautioned not to place undue reliance on any forward-looking
statement. The forward-looking statements in this announcement reflect views held only as
at the date of this announcement.
8 Refer to ASX announcement dated 12 December 2022 for an updated JORC compliant Mineral Resource Estimate.
9 Refer to ASX announcement dated 7 November 2022 for the Maiden Mineral Resource for Celsius’ Sagay Cu-Au Project
10 Refer to ASX announcement dated 1 July 2021 for the updated Mineral Resource Estimate for the Opuwo Project.
7
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
Appendix 1: The following tables are provided to ensure compliance with the JORC Code (2012)
requirements for the reporting of Exploration Results for the Sagay Project.
SECTION 1:
Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
JORC Code explanation
• Nature and quality of sampling (e.g.
cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down whole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to
the Public Report. In cases where
‘industry standard’ work has been
done this would be relatively simple
(e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from
which 3 kg was pulverised to
produce a 30 g charge for fire
assay’). In other cases, more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual commodities or
mineralisation types (e.g.,
submarine nodules) may warrant
disclosure of detailed information.
Drilling
techniques
Drill sample
recovery
Commentary
• Samples were collected from diamond
core drilled from the surface. All drill
core was generally sampled on 2-meter
intervals. In cases where geological and
mineralogical characteristics change,
sample length was not less than 1
meter.
• Core samples cut into half using
diamond core saw following the cutting
lines marked by the Geologist. Split
cores returned to its respective core
tray.
• Samples were shipped by company
vehicle to Intertek Testing Services
which is an external laboratory located
in Manila, Philippines.
• Crushed samples were fire assayed for
gold (Au) using a 30-gram charge, with
a detection limit of 0.005 ppm. Gold
values greater than 50 ppm were
determined by gravimetric fire assay.
• Copper (Cu) values were assayed using
four-acid digestion. Elements
determined by ICP-OES/MS with AAS
finish with final reporting for a total of
36 elements.
• Drill type (e.g., core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
• Diamond drilling was used to capture
the samples which are the subject of
this release.
• Method of recording and assessing
core and chip sample recoveries
and results assessed.
• Core recovery has been recorded for
every interval as part of the routine
geomechanical logging.
• Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
• Recovered core lengths on average
were measured to be approx. 97% for
the drill holes with form part of the MRE,
• The core drilling utilised a triple-tube
core barrel from collar to end-of-hole to
ensure optimum core recovery.
8
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
Criteria
JORC Code explanation
• Whether a relationship exists
between sample recovery and
grade and whether sample bias may
have occurred due to preferential
loss/gain of fine/coarse material.
Logging
• Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
• Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of
the relevant intersections logged.
Commentary
indicating a high recovery and minimal
lost core.
• All drilling activities were supervised by
company Geologists. Trained Core
house technician were responsible for
the core recovery determination.
• Geologists were tasked to oversee the
daily quick log report down to
sampling. Daily quick log form was
completed to identify the geological
details such as lithology, alteration and
mineralisation with corresponding
percentage estimate of Cu minerals and
Cu grade, using an established
geological code.
• Detailed logging proceeds describing
geological characteristics present in the
core, i.e. lithology, alteration,
mineralogy, structures, etc.
• Core photography was undertaken after
completing the geomechanical logging.
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and
whether quarter, half or all core
taken.
• If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
• Samples were routinely taken over a 2m
interval, and cut in half, with half of the
drill core sent for analysis and half of the
drill core retained for future reference.
• Samples were cut on site using a hand
core saw. Samples were then selected
and bagged on site prior to delivery to
the laboratory (Intertek) in Manila for
sample preparation.
• The sample size is considered
appropriate for type of material being
samples.
• Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance results for field
duplicate/second-half sampling.
• Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is
considered partial or total.
• For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
• Samples were fire assayed for gold (Au)
using a 30-gram charge, with a
detection limit of 0.005 ppm. Gold
values greater than 50 ppm were
determined by gravimetric fire assay.
Copper (Cu) values were assayed using
four acid digestion. Elements
determined by AAS finish.
• The procedures for the submission of
samples to the laboratory also include
9
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
Criteria
JORC Code explanation
model, reading times, calibrations
factors applied and their derivation,
etc.
• Nature of quality control
procedures adopted (e.g.
standards, blanks, duplicates,
external laboratory checks) and
whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
Commentary
the regular insertion of QA/QC samples
in every transmittal form or batch, which
was typically delivered to the laboratory
in batches of 50 numbered samples. For
each batch of 50 samples a total of 43
came from core samples and an
additional 7 samples were included for
QA/QC checks, which were as follows:
o
Four referenced standards
o
One coarse (unrecognisable)
blank
o
One field duplicate taken from
the quartered core
o
One referenced Blank
• After sample preparation, all samples
were sent for final analysis to Intertek at
their laboratory in Manila. Intertek is an
internationally recognised and ISO/IEC
17025:2005 & ISO/IEC 17020:2004
certified independent laboratory.
Verification
of sampling
and
assaying
• The verification of significant
intersections by either independent
or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
• Discuss any adjustment to assay
data.
• Analytical procedures provided by an
internationally certified laboratory is
considered in line with industry
standard for the type of deposit and
mineralisation identified at the Property.
• Apart from the verification of the
procedures and results as described
above, no further verification of the
sampling and assaying have been
undertaken.
• None of the diamond drill holes in this
report are twinned.
10
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
Criteria
JORC Code explanation
Commentary
Location of
data points
• Accuracy and quality of
surveys used to locate
drill holes (collar and
down-hole surveys),
trenches, mine workings
and other locations used
in Mineral Resource
estimation.
• All data reference points and maps for the Sagay
database, including drill hole collar co-ordinates are
recorded in WGS 84/UTM Zone 51N.
• Specification of the grid
system used.
• Quality and adequacy of
topographic control.
Data
spacing and
distribution
11
• Compass measurements taken by Geologists were
used to establish the dip and azimuth of the collar
hole as part of their initial collar surveys. Drill collar
locations were positioned using a handheld Garmin
GPS unit, set to UTM WGS 84 Zone 51N coordinate
reference system, with an accuracy expected to be
within 2 metres. Downhole surveys were also
completed using a Keeper Gyro at 50m intervals.
• Collar surveys were then logged into the master MS
Excel spreadsheet as part of the database.
• Data spacing for
reporting of Exploration
Results.
• The drilling which is the subject of this release was
designed to test shallow oxide copper mineralisation
at between 50m and 100m spacing.
• Whether the data
spacing and distribution
is sufficient to establish
the degree of geological
and grade continuity
appropriate for the
Mineral Resource and
Ore Reserve estimation
procedure(s) and
classifications applied.
• The drilling completed at was drilled towards the
south-east at 60 degrees. This angle and direction
was chosen to drill perpendicular to the dominant
geological trend at Nabiga-a, which is close to
vertical towards the north-east, in addition to the
horizontal orientation of the oxide copper
mineralisation close to the surface.
•
• Whether sample
compositing has been
applied.
Orientation
of data in
relation to
geological
structure
Sample
security
• Whether the orientation
of sampling achieves
unbiased sampling of
possible structures and
the extent to which this is
known, considering the
deposit type.
• The drill hole orientations at Nabiga-a Hill are largely
towards the south-west or towards the south-east.
These orientations were chosen to cut roughly
perpendicular to the interpreted dominant structural
trend and possible trend of the mineralised intrusive
rocks which are trending towards the north-east, and
some evidence of a trend to the north-west.
• If the relationship
between the drilling
orientation and the
orientation of key
mineralised structures is
considered to have
introduced a sampling
bias, this should be
assessed and reported if
material.
• The dominant trend of the intrusive rocks which are
interpreted to be related to the copper-gold
mineralisation has an overall strike of 40 to 60
degrees and a near to vertical dip. The drill holes
which are dipping approximately 60 degrees towards
the south-east appear to be at a good angle to
effectively test the copper-gold mineralisation in this
trend. The holes which have been drilled towards the
south-east are optimal for some cross cutting northwest trending structures, but at a poor angle to test
the dominant copper-gold mineralisation which is sub
parallel to these drill holes.
• The measures taken to
ensure sample security.
• The following standard procedures were
documented to have been followed in relation to
sample security for all Nabiga-a Hill diamond drilling:
o
Sample bags are arranged in sequence
according to its sample number. These are then
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
Criteria
JORC Code explanation
12
Commentary
weighed and jotted down to a sample dispatch
note which details the sample numbers, sample
type and laboratory processing required.
Geologists ensures that the transmittal form is
correct for encoding and submission. The bags
of samples are sent to Makati office by company
vehicle. No unsupervised third parties were
given access prior to the chain of custody
procedure.
Audits
reviews
or
• The results of any audits
or reviews of sampling
techniques and data.
o
Upon receipt of samples, these were arranged in
sequence to review the numbers, and a sample
received report was sent to the Geologists.
Samples are individually weighed again for
verification.
o
Samples were then delivered to Intertek Testing
Services along with two copies of the sample
dispatch form. One copy for the laboratory to
accept custody of the sample, and the
signed/received copy return to database
custodian given access prior to the chain of
custody procedure.
• No other specific audit or review was conducted
other than the validation checks by the author
documented earlier regarding the sample
preparation, analysis or security for the information
for the Sagay drill hole database.
ASX RELEASE | QUARTERLY REPORT | 31 DECEMBER 2023
SECTION 2:
Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenement
and
land
tenure
status
• Type, reference
name/number, location
and ownership including
agreements or material
issues with third parties
such as joint ventures,
partnerships, overriding
royalties, native title
interests, historical sites,
wilderness or national
park and environmental
settings.
• The Nabiga-a Copper-Gold project is at the northeastern part of Negros Island within the Cities of
Sagay and Escalante Negros Occidental.
• The security of the tenure
held at the time of
reporting along with any
known impediments to
obtaining a licence to
operate in the area.
•
Exploration
done
by
other
parties
• Acknowledgment and
appraisal of exploration
by other parties.
• The underlying title is in the name of the
Philippines registered corporation Tambuli Mining
Company Inc. (“TMCI”) is currently 100% owned by
a private Delaware Company who in turn is owned
by Celsius Resources Limited (“CLA").
• TMCI was first granted a single Exploration Permit
denominated as EP-000003VI on 6 May 2008
under Phelps Dodge Exploration Corporation –
Philippine Branch (PDEC), which was later acquired
by Freeport-McMoRan Exploration Corporation –
Philippine Branch (FMEC) in 2007. The permit area
covers a total of 4,594.23 hectares, where the
Nabiga-a Hill Deposit is situated.
• On August 11, 2021, TMCI, now a subsidiary of
CLA, was granted a fourth exploration permit
renewal (extension) which is valid until February 10,
2024. The current two-year renewal period allowed
the resumption of ore definition drilling activities
aimed to define the deep ore zone (two drill holes),
its shallow/near surface extensions (three drill
holes), and test possible near surface chalcocite
ore zones (three drill holes).
• Exploration work and drilling was completed by
TMCI which was a subsidiary of Freeport-McMoRan
Exploration Corporation-Philippine Branch from
year 2008 to 2016.
• The exploration activities were generally
completed over two stages. From 2008 up to 2009,
the work was focussed on project assessment
which included surface sampling and mapping, in
addition to a number of ground geophysical
surveys, most particularly a ground magnetic
survey and a series of 2D Induced Polarisation
surveys.
• From 2012 through to 2016 the exploration
activities were focused on diamond drilling to test
the targets identified from the work completed
over 2008 and 2009. The drilling activities were
predominately at the Nabiga-a Hill Project with all
drilling results reported in this release.
Criteria
JORC Code explana