Drilling of MCB Project’s third hole (MCB-036) completed with a final drilling depth of 860.20m and average core recovery at 97%. MCB-036 total intersection of 671m @ 0.43% copper and 0.12g/t gold, from 19m downhole, including internal shallow higher-grade intervals of 122m @ 0.92% copper and 0.24 g/t gold from 27 and 13m @ 3.69%…